A water transfer pump timer can restrict transfer between two ground-level tanks to chosen hours or stop a manually started transfer after an elapsed period. It cannot establish that the source still contains usable water or that the destination has room. For unattended transfer, use an approved control arrangement that combines the time rule with separate source-low and destination-high protection. Check the complete pump, starter and level-control arrangement before choosing the timer.
The useful question is not simply how many minutes the pump should run. Ask which conditions permit a start, which conditions demand a stop, and what happens if the permitted period ends before enough water has moved. Keeping those decisions separate makes commissioning and later fault finding much clearer.
Give time and water level different jobs
A clock schedule answers when transfer is allowed. Destination demand answers whether transfer is needed. Source permission answers whether there is enough usable water to pump. Motor protection answers whether the electrical and operating conditions allow the motor to run. A sensible proposal names each job and identifies the equipment that performs it.
This is a conceptual operating rule, not a wiring diagram: transfer is permitted only when the approved time, source, destination and motor conditions agree. The installer must determine how that rule is implemented in the exact starter. Do not assume that an auto switch accepts two level signals just because it includes a timer.
VUKAR explains the distinction in its tank-filling comparison. A timed stop acts on time; level control responds to the supported level signal. The two-tank case needs information from both ends of the transfer route.

What must the source-low stop protect?
The relevant level is the lowest level at which the installed pump can operate as intended. It is not automatically the physical bottom of the tank. The pump manufacturer's inlet, priming and operating requirements matter, along with the actual suction arrangement. A technician should establish the suitable low point and the level at which transfer may be allowed again.
Check whether a source refill can make the level rise briefly and then fall again. If the control repeatedly starts and stops around one point, the installation needs review of its operating band, inflow and pump duty. Extending the timer does not solve unstable source availability.
KSB's level-measurement guidance identifies minimum and maximum switching levels, vessel volume, inflow, outflow and start frequency as relevant design considerations. Its sump example is not a wiring prescription for your clean-water tank, but the need to assess the actual vessel and flows applies to the planning discussion.
Destination-high means stop, even inside the window
The destination can be nearly full when a scheduled transfer begins. A fixed daily duration that was suitable yesterday may be excessive today. The destination-high stop should therefore remain effective throughout the permitted period in the approved design. The clock must not be treated as proof that there is space.
Ask the installer how the destination calls for a refill and how it clears that request. A practical refill band avoids treating every small use of water as a reason for another start. Sensor positioning and freedom of movement also need checking against the tank, inlet turbulence and the selected sensor instructions.
Inspect the overflow route as well. It is a visible way to detect an abnormal fill, but an overflow pipe is not the planned stopping method. Keep lids, inspection access and tank hygiene suitable for the stored water's intended use; automation does not establish water quality.

Build a tank-to-tank transfer schedule from volume
Illustrative worked example: all values below are assumed. They describe no measured installation. Suppose the destination needs another 1,200 litres before the next use period. Assume the pump delivers 40 litres per minute into that tank under the expected operating conditions. The arithmetic transfer time is 1,200 ÷ 40 = 30 minutes.
Now assume the permitted window is 06:00–06:45. There are 45 minutes available, but this does not guarantee a successful fill. A late start, source-low stop or reduced delivery can leave less than 30 effective pumping minutes. The 15-minute difference is a planning allowance in this example, not a universal margin or recommended setting.
If actual delivery were only 30 litres per minute, the same assumed volume would need 40 minutes. If the destination were already higher, it would need less. Use the tank capacity and fill-time calculator to organise your own dimensions and measured delivery. Confirm usable volume rather than relying only on the tank's advertised capacity.
| Question | Example answer | What still needs checking |
|---|---|---|
| When is transfer allowed? | 06:00–06:45, assumed | Actual source availability and site restrictions |
| How much water is wanted? | 1,200 litres, assumed | Destination level and usable space |
| How long might it take? | 30 minutes at assumed 40 L/min | Measured delivery and interruptions |
| What can stop it early? | Source low, destination high or motor fault | Approved independent control response |
Choose clock control or an elapsed stop deliberately
A clock is useful when transfer must occur during particular hours. An elapsed stop timer is useful when an operator checks conditions, starts the transfer and wants it stopped after a chosen duration. Neither function measures transferred volume. A cyclic timer repeats running and resting periods; it should not be substituted casually for a permitted-hours rule.
Read the timer-types guide before selecting the operating mode. For DEV-K3, DEV-K4 and DEV-P2, use the matching DM-Universal-V1 instructions on the current manual page. The supplied timer instructions provide up to 20 events. Plan without overlapping events; do not rely on an undocumented winner when two rules overlap.
Check the enabled days as carefully as the times. Day selection overrides the schedule, and changing the time or day while the pump is running can affect operation immediately. Make planned changes with a trained person present and recheck the next intended start and stop.
Write down what happens after an interruption
A power cut can consume most of a short transfer window. Before commissioning, define whether the approved arrangement should resume inside the remaining permitted period, wait, or require an operator check. Verify the actual response rather than inferring it from a saved schedule.
The documented memory choice concerns remaining run/rest time: mem Yes resumes the remaining run/rest period; mem No starts that period from the beginning. It is not evidence of a particular clock-retention duration. After an outage, check the displayed date, day and time as well as the schedule and levels.
A fault also needs its own response. Record the displayed condition and investigate it before repeating starts. Use the current manual's fault and reset instructions for the exact model and settings. A timer adjustment cannot repair a blocked pipe, unavailable source or electrical fault.

Prove the stops before leaving it unattended
Ask the installer to demonstrate each condition using the approved test method. The purpose is to observe the complete installation, including any external level controller, rather than just watch numbers change on a display. Keep the result with the settings record.
- Outside the allowed period, a refill request must not create an unintended start.
- At a permitted start, source availability and destination demand must still be checked.
- Source-low and destination-high conditions must each produce the intended stop.
- The end of the permitted period must give the documented response, including an incomplete fill.
- Power restoration and a sensor fault must follow the agreed recovery procedure.
Do not test by defeating protection or improvising live wiring. If the actual control response differs from the proposal, keep automatic transfer out of service until the installer resolves it.

Before ordering: send the supplier a simple description of both tanks, the pump type, supply phase and existing starter. Include which tank requests water, which tank can become empty, and when transfer must be prohibited. Request written confirmation of the external level-control interface and the response to a failed sensor. A relay contact current figure alone does not confirm that the device can switch the motor or that the proposed control circuit is compatible.
Use one record to distinguish three different failures
Log the scheduled window, actual start, actual stop, reason for stopping, source level, destination level and whether water arrived. That record separates no start, an early protective stop and a running motor with poor delivery. Each points to a different next investigation.
For the first several transfers, compare the destination's level gain with effective running time. A changing ratio deserves attention to delivery or concurrent water use; it is not automatically a timer fault. Give the installer the model code, existing starter details and this short record when requesting a suitable two-tank control proposal.