VUKAR TPM-V starter panel

VUKAR TPM-V Three-Phase DOL Starter: Installation and Cyclic Timer Settings

Mohit Vekaria

For a TPM-V 3 phase dol starter setup, set the cyclic timer and verify the water-level indicator independently from the motor controls. Have a licensed electrical contractor install the equipment and check the protection settings using the instructions for the installed revision.

TPM-V installation and equipment match

Read the motor nameplate before selecting the panel. Note the supply phase, rated voltage, horsepower (HP) and rated running current. Compare the installed panel’s model and rating with those details. The listed HP options help narrow the choice, and the electrician must check the actual supply and motor requirements.

The listed TPM-V options are rated up to 2 HP, 3 HP, 5 HP, 7.5 HP and 10 HP. Use the motor nameplate, operating current and starter requirements to confirm the correct variant. TPM-V specifications and options

A DOL starter, short for direct-on-line starter, applies the supply to the motor when the contactor closes. The contactor is the electrically operated switch in the motor circuit. Have the installer confirm the starting arrangement, protection, cable and phase sequence for this motor. Keep the supplied diagram with the panel.

Have the installer verify protective earthing, isolation and circuit protection. The supply must be isolated and verified off before anyone opens an enclosure or handles conductors. The electrician should check the phase conditions and verify normal motor operation before handing over automatic control. Central Electricity Authority safety regulations

TPM-V Powder-Coated Metal Enclosure
Use the installed panel label and the matching VUKAR wiring diagram during commissioning.

TPM-V cyclic timer settings

The float reports tank status on this indicator model. Use the displayed level to inform the operator during the timed run. When the full level itself must command a motor stop, plan an automatic level-control system with the installer.

Choose an initial run period from the water source and the pump maker’s operating limits. Observe whether water delivery remains steady toward the end of a normal run. Ask the installer how much rest the source and motor need, including any limit on starts per hour. Use those observations to agree on the first watched test.

VUKAR’s applicability table lists the run and rest functions on this model. Confirm the displayed label and unit on the installed revision before setting either interval.

Read back the saved run and rest durations with their units. The cycle begins and ends according to the installed operating mode. Watch the pump stop, time the rest from the actual stop, and stay for the next permitted start. That gives you evidence for both intervals. VUKAR timer types guide

If the motor stops before the intended time, note the display and the condition of the source. A protection stop, a stop from another control and a normal timer stop require different checks. Leave the running values in place while the installer investigates the reason for an unexpected stop.

Read the tank indication during filling and record the timed stop separately. The indicator gives the operator the tank state. Use the selected timer or normal stop control to end the run according to the operating plan.

TPM-V Cyclic Timer
Time a complete run and rest cycle from the actual motor transitions.

How to use TPM-V after installation

At handover, have the installer show which indication means the motor has started and which control stops it in normal operation. Ask them to identify the separate isolation point for maintenance and to record normal operating readings with the enclosure closed.

Before the watched test, confirm that water is available and the receiving point can accept it. Keep the enclosure closed and make sure the normal stop control is safely accessible. Agree on what counts as a successful run before you enable automatic operation.

  1. Confirm the saved settings. Read the active mode and relevant values with the installer. Record what should permit a start and what should end the run.
  2. Observe the motor response. Watch the level indication change during filling and separately observe the timed stop. Record the two events even if they occur close together.
  3. Verify recovery behavior. Ask the installer to document what happens after power returns or a protection condition clears. A permitted automatic restart can occur without a new button press.
  4. Keep a handover record. Record the TPM-V label, supply, motor rating, wiring reference and actual test results together.

What to record during commissioning

Start of run
Record the active mode, actual start time and whether water reaches the delivery point.
End of run
Compare the stop time with the saved interval and record whether delivery remained steady.
Rest period
Measure from the actual stop. Record the display and the source condition if it can be checked safely.
Next permitted start
Confirm the observed restart matches the saved rest duration and the operating rules for the site.

Observe each transition from a dry and safe location. If the actual response differs, record what the display, starter and pump each did. The installer can then trace whether a setting, an input, a protective condition or the motor circuit determined the outcome. VUKAR manuals and connection diagrams

Confirm the power circuit before testing automatic control

Have the electrician record the motor nameplate, panel variant and the protection devices fitted at the site. Ask them to check the supply and running readings under a normal load. The record should identify the readings on the panel and the measurements that were used to verify them. This gives a technician a reference if a phase or current indication appears later.

Show the operator where each check belongs

At handover, review the normal stop control, the isolation point and the display. Record which settings the operator is expected to use and which protection settings were checked by the installer. If the panel and motor are replaced at different times, keep both labels in the record so the new equipment can be checked as a combination.

Revisit the cycle when delivery changes

A pump can still run for the programmed interval while delivering less water than expected. During each inspection, note how delivery behaves near the end of the run and whether the source is ready at the next start. Review those observations with the installer before extending an interval or increasing the number of starts.

TPM-V troubleshooting after an unexpected stop

Read the display and note the elapsed run time, water delivery and the condition that preceded the stop. On applicable VUKAR controllers, FOL indicates overload, FDR indicates dry run, and HIU or LOU indicates high or low voltage. If a fault returns, have the cause diagnosed before another run. VUKAR fault-code guide

Record any phase-related indication as displayed. The electrician should investigate the supply and phase conditions before changing timing or protection. Use the installed model’s reset procedure after the fault has been addressed.

TPM-V Fault Display Indication
Keep the exact display indication and the time it appeared in the service record.

How do I decide whether the rest duration is still suitable?

Watch whether water delivery stays steady through the run and whether the source has recovered before the next start. Review the values with the installer when the source conditions or pump change.

When a pump, starter, float or water source changes, give the installer the previous commissioning record. Have them recheck the expected sequence and verify the changed installation before relying on automatic operation again.

Before the system is left on automatic

Review the normal start, normal stop and recovery behavior with the person who uses the pump. Keep the approved settings near the controller or in the site records. Where another control also affects the pump, identify its role and record who should be contacted if the motor responds differently from the documented sequence.

Record an unexpected event while it is fresh

If there is an unexpected stop or a delayed start, write down the time, the visible display and what the pump was doing. Also note any recent power interruption or change to the water source. Keep those details with the equipment model so the installer can check the relevant setting and conditions.

Recommended TPM-V Settings: Level Display, RUN and Mode-Specific AST/RST

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.