TPM-T daily run time stops early

Three-Phase Pump Stops Before Its Daily Run Time? TPM-T Clock and Run-Time Checks

Mohit Vekaria

If the TPM-T daily run time stops early, count the minutes the pump actually ran and note when the power returned. In daily run-time mode VUKAR describes TPM-T as completing the remaining programmed minutes after power returns. Any unfinished minutes clear at the daily reset. A protection stop or a different operating mode needs its own record.

Start with what the display shows

Visible state What it can mean and what to do
Motor stops before the daily total is reached Write down actual motor minutes, the active mode, any interruption and the daily reset boundary. Compare with the approved target for that daily period and record any resumed run separately.
The display suggests operation, but water is absent The command and water delivery are separate observations. Note whether the motor actually ran and whether water reached the usual outlet. Report the first missing response. In a supervised return to service, confirm both the motor response and steady delivery.
An unfamiliar indication, an unexpected stop or a visible trip Record the exact characters or lights, the time and the motor state from outside the closed enclosure. Leave protection values as commissioned. If the stop repeats or a breaker has tripped, leave further operation to a qualified electrician.

Start with the installed unit

Record the model and revision from the label, the motor nameplate and the active mode. Similar panels can have different menus. Use the installed revision’s guide for any setting, its units and the behavior of the selected mode.

TPM-T Daily running time · Start with the three visible observations. Daily minutes delivered · Outage time · Daily reset boundary
Start with the three visible observations. Daily minutes delivered · Outage time · Daily reset boundary

Catch the missed event while it is happening

Take one observation at the intended clock time and another when the pump eventually starts, if it does. In each observation record the displayed time, actual time, enabled day, selected mode and what the controller showed. A report that the motor was off at breakfast leaves out whether the clock was wrong, the event was disabled, a rest was still running or protection was active. The two observations give the installer something to compare.

Keep the previous stop in the same log. If the motor ran before the missed event, the elapsed pause and the event time describe two different clocks. Ask the installer whether the selected mode accepts that event while a rest is active. If the setup also uses tank control, add the real tank level and request. Record only conditions that the installed model supports. Use one controlled test event and leave overlapping events and approved protection values alone during the test.

A worked example · TPM-T

Say the daily target is 60 minutes and the motor ran for 25 minutes before an outage. In that same daily period the arithmetic leaves 35 minutes. Write down whether power returned before the daily reset, which mode was active and whether the motor actually resumed. An outage that extends beyond the reset changes which daily record the run belongs to. The numbers illustrate the count, so use the approved settings for your pump.

TPM-T product details

Count running minutes inside the correct day

A clock event is a time of day. A daily run-time target counts how many minutes the motor actually operates in the daily period. A cyclic RUN is the length of a single on period. The three values answer different questions. When the complaint is a short daily total, use the approved daily target and the real times the motor switched on and off.

Split the record at the daily reset described for the installed revision. A power cut belongs on the timeline, with the time the motor stopped and the time power came back. Only add intervals when the motor actually ran. Keep any visible fault and unexpected stop separate so the electrician can distinguish interrupted runtime from a different fault. Use the product’s daily run-time example and the installed revision’s approved settings for the comparison.

Set the clock before using a schedule

A clock event uses a time of day, such as 06:00. RUN and RST are elapsed durations, such as 10 minutes. Read the displayed time, weekday and enabled days together. A saved event can show the correct time yet remain inactive because the wrong day or mode is selected. Begin with one event the operator can safely observe.

Watch the opening and closing of the first window and record the actual behavior. If a pump is already running near closing time, use the installed revision’s instructions to determine how that mode handles the boundary. Write down whether it stopped, completed the current run or waited for a later permission. Test the specific sequence before adding overlapping events or leaving it unattended.

Choose RUN and RST from the water supply

RUN is the elapsed pump-on time. RST is the planned pause between cyclic runs in the selected mode. Choose RUN based on how long the source can deliver a steady flow, the space available where the water goes, and the motor maker’s permitted operating conditions. For RST, consider how long the source needs to recover and any minimum time between starts for the motor.

To estimate starts per hour during an uninterrupted cycle, add RUN and RST in minutes and divide 60 by the total. For example, 10 minutes on and 20 minutes off gives about two planned starts per hour. These are example values. Include any separate starts from other controls, power recovery or fault recovery when the installer reviews the motor’s actual start frequency.

TPM-T Daily running time · Compare the expected sequence with what happened. Daily minutes delivered · Outage time · Daily reset boundary
Compare the expected sequence with what happened. Daily minutes delivered · Outage time · Daily reset boundary

Keep supply events separate from the timer

On this three-phase model, a supply or phase-protection indication is a separate event from the end of a scheduled run. Record the indication as it appeared, its time and whether the pump was already running. A missing or unstable phase can require qualified diagnosis even when other equipment nearby has power. The electrician can compare the incoming supply, phase sequence and the installed protection settings against the approved record.

A changed indication can help the electrician decide where to measure. It cannot identify which wire or connection needs work. Keep the panel closed and leave tests of phase voltage, sequence and current to a qualified person. If the pump stops repeatedly or the breaker trips, leave further operation to the electrician. Give them the model, the motor nameplate and the exact time of the event.

Follow the command to the pump

A controller can show a request while the motor is still off. A starter switches motor power when the control circuit permits it. Observe the display, the starter’s visible response and water delivery as separate facts. These observations give the electrician a place to start without asking you to open the enclosure or touch conductors.

If the display shows that the pump should be running but there is no water, write down whether you could see or hear the motor run from a safe location. If the motor runs but delivery is absent or weak, record how long it ran and when the flow changed. Keep the display photo and the times together so the installer can compare them with the actual settings.

Read the protection indication with the operating record

For overload, note the moment the motor stopped and whether it had reached normal running speed. The configured current response can flag a motor, supply or setup problem. For dry run, record whether water reached the outlet and when delivery weakened. An electrician can compare those events with the installed protection setup and water source.

For a voltage indication, record the time and any interruption you observed. Copy the exact characters on the display. Ask the electrician to use the instructions for the installed revision to identify the indication and decide on recovery. If the fault repeats, leave further operation to the electrician.

TPM-T Daily running time · Keep the display, timing and motor response in one record.
Keep the display, timing and motor response in one record.

Send the installer one usable event record

Use the exact model and revision at the top of your note. Add the symptom and the active operating mode. On the next line, put the actual clock time, elapsed motor time if known, the visible indication and the water condition. State what you expected in the same note. If a detail could not be observed safely, leave it blank and tell the electrician.

Avoid resetting first and trying to reconstruct the event later. The display, tank condition or rest period can change once the equipment is stopped or power returns. If the electrician authorizes another watched test, agree on the expected start and stop in advance and keep the same model record. If a breaker trips, a protection indication returns or the panel appears damaged, leave further operation to the electrician.

TPM-T Daily running time · Use this list for a supervised observation.
Use this list for a supervised observation.

Model instructions and service

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.