If the DM-TP-RTLC-96 tank pump is not starting on schedule, line up the approved clock window, the tank’s water request and the actual three-phase motor start. The external starter’s response is worth recording independently of the meter. The active mode determines which conditions can permit the start.

Start with what the display shows

Visible state What it can mean and what to do
Scheduled time passes while the tank needs water Record the panel time, day, mode and visible tank request together. Compare them with the approved schedule. If the installer authorizes a watched test, record when both the documented timing and level conditions are met.
The display suggests operation, but water is absent The command and water delivery are separate observations. Note whether the motor actually ran and whether water reached the usual outlet. Report the first missing response. In a supervised return to service, confirm both the motor response and steady delivery.
An unfamiliar indication, an unexpected stop or a visible trip Record the exact characters or lights, the time and the motor state from outside the closed enclosure. Leave protection values as commissioned. If the stop repeats or a breaker has tripped, leave further operation to a qualified electrician.

Start with the installed unit

Record the model and revision from the label, the motor nameplate and the active mode. Similar panels can have different menus. Use the installed revision’s guide for any setting, its units and the behavior of the selected mode.

DM-TP-RTLC-96 First observations · Clock window · Receiving tank request · Three-phase motor
First observations · Clock window · Receiving tank request · Three-phase motor

Catch the missed event while it is happening

Take one observation at the intended clock time and another when the pump eventually starts, if it does. In each observation record the displayed time, actual time, enabled day, selected mode and what the controller showed. A report that the motor was off at breakfast leaves out whether the clock was wrong, the event was disabled, a rest was still running or protection was active. The two observations give the installer something to compare.

Keep the previous stop in the same log. If the motor ran before the missed event, the elapsed pause and the event time describe two different clocks. Ask the installer whether the selected mode accepts that event while a rest is active. If the setup also uses tank control, add the real tank level and request. Record only conditions that the installed model supports. Use one controlled test event and leave overlapping events and approved protection values alone during the test.

A worked example · DM-TP-RTLC-96

At 09:00 the clock window opens, but in this example the receiving tank does not request water until 09:12. Put the two times and the actual motor response on one line. If a request is visible at the approved time on another day and the motor still stays off, save the meter state and any separate supply indication. The installer can compare the two cases with the commissioned mode.

DM-TP-RTLC-96 Model settings guide

Set the clock before using a schedule

A clock event uses a time of day, such as 06:00. RUN and RST are elapsed durations, such as 10 minutes. Read the displayed time, weekday and enabled days together. A saved event can show the correct time yet remain inactive because the wrong day or mode is selected. Begin with one event the operator can safely observe.

Watch the opening and closing of the first window and record the actual behavior. If a pump is already running near closing time, use the installed revision’s instructions to determine how that mode handles the boundary. Write down whether it stopped, completed the current run or waited for a later permission. Test the specific sequence before adding overlapping events or leaving it unattended.

Separate a request from permission to start

A low tank can create a request before a clock window opens. Depending on the selected mode, a start can also depend on the state of the water source, any cyclic rest period and protection. Write each condition in a separate line of the event log. That makes it easier to find the actual reason for a delayed start.

Where the controller offers separate operating windows for water-level and cyclic modes, label each saved window by its purpose. Test inside and outside the relevant window with the installer. Ask them to record how your revision treats a low tank at closing time and what it will do when another window opens.

DM-TP-RTLC-96 Compare the operating sequence · Clock window · Receiving tank request · Three-phase motor
Compare the operating sequence · Clock window · Receiving tank request · Three-phase motor

Record the meter and starter as separate devices

This motor-protection meter is part of the installed control circuit. A visible state on the meter tells you what that device is reporting. The actual response also depends on the connected starter, the motor and the water path. Write down the meter model and the starter model. Keep the motor nameplate with the service record.

If you can see an operating indication without opening the enclosure, record when it appeared and what the motor did. If the motor ran, write down when water reached the normal outlet. These times give the electrician a way to identify the first missing response. Leave terminal tests, relay or contactor checks and current-sensing work with qualified service. The meter model does not establish the correct motor settings by itself.

Read the real water level and the controller state

Mark the observed low and full switching points with the installer while the sensor is in its normal installed position. Write down the physical water level, the state shown on the controller and when the motor actually starts or stops. If those three observations disagree, keep the evidence and ask the installer to review the level input and the selected mode.

A level sensor can report that the receiving tank needs water. The start can still depend on source conditions, timing and protection. During a supervised test, observe a valid request and the documented full-level stop. If there is a source input, ask the installer to demonstrate its low-water response using the prescribed method while keeping the pump protected.

Keep supply events separate from the timer

On this three-phase model, a supply or phase-protection indication is a separate event from the end of a scheduled run. Record the indication as it appeared, its time and whether the pump was already running. A missing or unstable phase can require qualified diagnosis even when other equipment nearby has power. The electrician can compare the incoming supply, phase sequence and the installed protection settings against the approved record.

A changed indication can help the electrician decide where to measure. It cannot identify which wire or connection needs work. Keep the panel closed and leave tests of phase voltage, sequence and current to a qualified person. If the pump stops repeatedly or the breaker trips, leave further operation to the electrician. Give them the model, the motor nameplate and the exact time of the event.

Read the protection indication with the operating record

For overload, note the moment the motor stopped and whether it had reached normal running speed. The configured current response can flag a motor, supply or setup problem. For dry run, record whether water reached the outlet and when delivery weakened. An electrician can compare those events with the installed protection setup and water source.

For a voltage indication, record the time and any interruption you observed. Copy the exact characters on the display. Ask the electrician to use the instructions for the installed revision to identify the indication and decide on recovery. If the fault repeats, leave further operation to the electrician.

DM-TP-RTLC-96 Display and response record
Display and response record

Keep two clean records for a repeat event

An older note helps if it lists the same model, revision and operating mode. Put it beside the new one. If a pipe was changed, the pump serviced or the water source was different, label that change with its date. State which times came from direct observation. A photograph of the closed panel and the model label helps the installer match the right documentation.

If a second watched test is safe and the installer authorizes it, agree in advance which single event to observe. Use the approved setup and keep people clear of the motor and pump. Capture the visible state and the actual response at the same moment. A shorter note with good timestamps is easier to use than a long note made from memory after a reset.

DM-TP-RTLC-96 Observations for a supervised test
Observations for a supervised test

Model instructions and service

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.