Block A’s roof tank is full, but Block B is calling the caretaker for water. Both blocks share a pump. For a Bengaluru apartment with this layout, VUKAR can quote a custom wired multi-tank automatic water level controller from Rajkot. Start with a sketch showing which sump feeds the pump and how water gets to each block.
When the water source changes, redraw the layout
JICA’s planning survey for the 110 villages in the Bengaluru project area documented reliance on deep wells and tankers. Cauvery Stage V opened in October 2024 to extend piped service to those suburbs. If your site adds a piped inlet, show which tank receives it and which outlets still share a pump. The new inlet can change your site plan and leave the roof tanks with the same separate fill needs.
JICA Bengaluru planning survey · Cauvery Stage V opening record
Where an individual tank signal matters
VUKAR’s custom system uses wired level sensing for individual tanks. It can operate the supply pump and the connected filling arrangement. For two roof tanks on separate branches, ask the electrician and plumber to mark how each branch is controlled. Ask the supplier to quote the required valves and cable runs against that drawing.
Compare standard VUKAR controller models
| Site sketch shows | Ask for |
|---|---|
| One sump and one roof tank | Compare a standard two-float controller for the compatible pump. |
| One pump serves two roof tanks | Quote each tank sensor, branch valve and the agreed fill order. |
| Several sumps or several pumps | Send a full layout and ask for a written control sequence before pricing. |

A two-block example
Suppose Block A needs 800 L and Block B needs 1,200 L. If the agreed design fills one branch at a time at a measured 40 L/min at each branch, that is about 20 minutes for A and 30 for B. If A becomes full first, ask the supplier to show how its branch will close and how B will finish filling. These are illustrative volumes and flow. Actual branch flow and the fill order come from the site plan.
A quote that the committee can compare
Send the layout, pump nameplates, tank count, valve count, measured cable routes, supply type and Bengaluru delivery PIN. Ask for the controller, sensors, valves, cables, fitting and commissioning as separate lines. Ask who will attend the site and who handles follow-up support. VUKAR configures and prices the custom system after reviewing the layout.
What to ask for on handover day
Have the installer demonstrate an A-only refill, a B-only refill and the agreed response when the source sump is too low. Ask the caretaker to record which light or display message means each fault. Keep the sketch and the approved operating sequence together so the next shift can use both.