Independent transformer screening tool
Existing Transformer Load & Expansion Headroom Screener
Document one simultaneous load reading, add planned load and screen arithmetic headroom. This does not select a transformer.
Step 2
Screening result
Enter transformer, measurement and expansion details to screen headroom.
Screening band
——- Calculated full-load current
- —
- Current utilization
- —
- Measured simultaneous load
- —
- Remaining nameplate headroom
- —
- Planned added load
- —
- Projected utilization
- —
Phase/current consistency note
—
Qualified review triggers
How the screening works
Single-phase current uses kVA × 1000 ÷ V. Three-phase current uses kVA × 1000 ÷ (√3 × line-to-line V). Planned kW is converted to kVA using the entered power factor. No diversity factor is assumed.
Critical limits
Arithmetic screening only—not final transformer selection. It does not determine conductors, breakers, relays or protection settings. Motor starting, harmonics, temperature, altitude, duty cycle and future growth require qualified review.