Pump control box and clock for a cyclic pump timer operating window

How Clock Windows and Cyclic Runs Work Together

Mohit Vekaria

Use a clock and cyclic timer together when a pump should repeat short runs during certain hours. The clock defines the allowed window. The cyclic timer sets how long the pump runs and rests inside it. A 06:00–09:00 window with a 25-minute run and a 20-minute rest can produce several starts before 09:00. Ask what your controller does if one of those runs reaches the end of the window. The installed model, selected mode and any independent stop controls determine the actual behavior.

A schedule on the front panel is only one part of the site sequence. If a tank fills early and the high-level signal stops the motor at 06:12, the next eligible run can depend on how the timer and level control share permission. Test early stop and renewed demand together if the job uses both. Ask the installer to record whether the run timer stops counting when the motor stops, and whether the next request can come before the original 06:45 expectation. The written sequence should reflect the installed circuit.

Set the clock rule before choosing a cycle

Start with the site rule. If a shared borewell can supply one plot between 06:00 and 09:00, those hours describe permission to operate. The run and rest values deal with what the pump does while that permission applies. A clock timer can issue individual ON and OFF events on supported equipment. A cyclic operating window lets a programmed run and rest pattern repeat between set hours. Check which of these features your controller uses in the chosen mode.

Give each setting its own name in the written plan. Say which days the window is open, the time it opens and closes, how long a run lasts, and how long the pump should rest before another request. Record where water may come from and where it goes. A low source level or a full receiving tank can still prevent operation when the site has the relevant protections and controls. Clock permission alone gives no information about water availability.

VUKAR's pump timer types guide describes operating hours for repeating cycles on models that support them and separately describes hierarchical scheduling for more complex patterns. A hierarchical pump timer can allow more than one configured cycle within a broader programme on supported equipment. If one standard pattern does the job, keep it simple. If two periods need different behavior, write both requirements down and check the exact options on the chosen device.

Pump house and buried outlet line used during scheduled cyclic irrigation
Illustration. Pump house and buried outlet line used during scheduled cyclic irrigation

Put the cycle on paper

Use a sample case with a 06:00 to 08:50 window, 25 minutes ON and 20 minutes OFF. Imagine a controller that starts its first cycle at opening and restarts on the next scheduled cyclic turn while the window remains open. Assume the pump is otherwise permitted to run throughout. The first run is 06:00 to 06:25. With 20 minutes of rest, the second starts at 06:45. The same pattern gives starts at 07:30 and 08:15. If you use those values unchanged, 08:40 is the last scheduled stop before the window closes.

To see a genuine edge case, move the closing time to 08:30, leaving the pattern unchanged. The 08:15 run would normally last until 08:40. The controller now sees a clock boundary before the cyclic run has reached its own stop. The alternatives below describe possible designs. They are ways to write and test a requirement, with no assumption that a particular VUKAR firmware offers every choice.

Boundary rule What the 08:15 cycle does Actual motor minutes in the example
Stop at 08:30 Runs for 15 minutes 90
Finish an eligible run Runs until 08:40 100
Start only if the full run fits Stays stopped at 08:15 75

The totals include the three full 25-minute runs already made. Even a ten-minute difference can matter if water must stop at a fixed time. If the rule at a shared installation is a hard close, check that both late starts and late running are handled the way the agreement requires. An installer can check whether the specified controller mode provides that behavior or whether the control design needs another appropriate stop path.

Operator recording the opening and closing times of a pump timer window
Illustration. Operator recording the opening and closing times of a pump timer window

Decide where the next cycle starts

The way a window opens affects the first run. A design can start the ON period at opening, begin with a rest condition, resume a retained position or wait for a fresh demand. The answers depend on firmware and configuration. Plan to observe the actual first start. Record whether the motor starts immediately at the opening time or after some other documented condition is met. Do the same after a fault or power return when permitted and supervised.

For a clock window interruption, imagine the supply fails at 07:40 while the 07:30 run is ten minutes old. Power returns at 07:55. Ask which time the controller retains and whether it resumes a partial run, waits for a clock event or follows another recovery rule. The device might require an external permission before the starter can respond. A delayed restart setting also has a job of its own. It sets a wait after power returns on supported equipment, while the clock and cycle settings define the programme.

The DEV-P2 setup guide recommends documenting the behavior at closing and after an authorized recovery test. The DEV-P2 specifications list cyclic operating hours and timer power-failure recovery. The single-phase comparison lists operating hours for DEV-K3 and DEV-K4. Check the supplied instructions for the specific mode and controller revision. The terms on the product page help you choose which function to test.

Match run and rest times to the pump

Start with the water task. A field line may take a few minutes to fill before water reaches its furthest outlet. A borewell can drop below an acceptable level during a run when the pumping rate exceeds what the well can sustain. A rest interval gives the well time to recover, and the installed source protection may still need to stop or prevent a run. Ask a pump specialist to assess the site if output tails off repeatedly or protective stops occur.

Start frequency also matters. Over two hours, a repeating 25-minute run and 20-minute rest produces fewer starts than a five-minute run and five-minute rest. A longer window can likewise add starts even though the cycle values stay the same. Look up the manufacturer's permitted starting frequency, minimum operating conditions and any required rest. The Grundfos motor guide shows how starting limits vary by model. Use the limits supplied for the installed motor.

Estimate water delivery by timing a safe, representative flow observation or using a suitable meter. Compare that observation with the time needed for the job and the agreed end of the window. If 08:30 is a strict close and you must complete an automatic 25-minute cycle, the last fully eligible start is 08:05. That simple pencil check can expose a shortfall before anyone relies on the programme.

Irrigation outlet and water storage tank for checking cyclic delivery
Illustration. Irrigation outlet and water storage tank for checking cyclic delivery

Check the boundary with the enclosure closed

Ask the installer to use the instructions for the controller and set up a supervised test suitable for the motor and water system. Verify that the displayed time and selected day are correct. Keep the normal stop control accessible and keep people away from equipment that may start automatically. Watch the motor, the controller's request indication if provided, and the water outlet from positions that are safe to use.

Record four distinct moments. Note what happens just before the window opens, at the first eligible start, after an ordinary cyclic stop, and at closing with a run already active. At each point write the time shown, the expected request and what the motor actually does. If a start does not come through, include any level or motor protection indication. Have a qualified installer investigate differences in the control circuit or revise the settings.

When the schedule crosses midnight, test or verify how the day selection works at both ends of the window. A Friday opening at 22:00 and a Saturday closing at 02:00 might use one spanning programme or separate entries depending on the controller. Check how exceptions, such as a closed day or an external stop, affect the whole period. Save the approved settings and read them back after any test changes.

Leave the operator a copy of the timing table that reflects the actual configured mode. Include the first permitted start, last permitted start, closing behavior and what to check after a power cut. Ask the installer to demonstrate the agreed closing rule once with the motor in a run. That gives the operator a time and a visible result to compare with the next day.

Closed pump control box for observing the stop at the end of a timer window
Illustration. Closed pump control box for observing the stop at the end of a timer window