Water loss • Recurrence • Cost

Water Leakage & Tank Overflow Cost Calculator

For households, plumbers and maintenance teams: convert an observed leak or tank overflow into estimated water loss and user-entered variable cost.

Step 1

Describe the water loss

Source
How did you measure it?

Use a measured, manufacturer-provided, or otherwise verified rate. The calculator does not verify this value.


Occurrence and recurrence

Planning calendar: 30 days/month × 12 months = 360 days/year.

Cost basis
₹/kL

Variable usage charge only; zero is accepted.

Step 2

Your estimate

Estimate water loss and cost

Enter your observed measurement, recurrence and your own cost basis.

Formula and planning convention

Flow = observed volume ÷ observed time. Event loss = flow × active duration. Monthly loss = event loss × events/active day × active days. Annual loss = monthly loss × 12. This is a 30-day month and 360-day planning year.

Worked example

At 10 L/min for 5 minutes, twice daily for 30 days, loss is 3,000 L (3 kL) per month. At ₹30/kL, proportional variable cost is ₹90.

Cost exclusions

Excludes slab billing, fixed and sewer charges, taxes, penalties, repair cost, damage, electricity and minimum tanker orders.

Sources

Estimate water lost and monthly cost from leaks or tank overflow using measured flow, duration, frequency and local water or pumping cost.

What to enter

Use current, project-specific values for measured flow, duration, frequency and local water or pumping cost. Check every unit before calculating and compare like-for-like inputs. The template controls the actual fields and calculations; this supporting copy does not replace its labels, formulas or result logic.

How to use the result

Treat water loss and monthly cost as estimates. Actual loss and cost vary with changing flow, event duration, tariff, pumping efficiency and measurement accuracy.

Before making a decision

Verify source measurements, equipment specifications and operating conditions. Have a qualified professional review the final selection, safety and installation requirements before purchase, connection or construction.