VUKAR BOM-H pump starter panel

VUKAR BOM-H Borewell Starter Panel: Installation and Auto-Off Timer Settings

Mohit Vekaria

For a BOM-H borewell starter panel setup, match the single-phase pump and panel variant first. Start the pump when you need water, then let the stop timer end the run. The built-in MCB adds short-circuit protection for the panel circuit. Have a licensed electrical contractor install the panel and use the wiring diagram for the installed model and revision.

BOM-H installation and motor match

Find the motor nameplate or the paperwork for the pump. Record the phase, rated voltage, horsepower (HP) and rated current in amps. Check the BOM-H panel label and share both sets of details with the installer. The product listing shows these options: 0.5 HP, 0.75 HP, 1 HP, 1.5 HP, 2 HP and 3 HP. Have the installer confirm the exact variant and its suitability for the motor and operating duty. See BOM-H specifications and variants

If you are replacing a panel, keep the pump documents and record how the old setup was used. Ask the installer to compare the new panel and motor connections with the supplied diagram. Existing labels can help identify the conductors, while the electrician verifies each connection before energizing.

Ask the installer to verify protective earthing, the supply and motor connections, and the circuit protection for the installation. Where the motor needs capacitors, the installer should confirm the type, rating and connections from the motor and panel documentation. The supply must be isolated and verified off before the enclosure is opened for wiring or service. Central Electricity Authority safety regulations

The built-in miniature circuit breaker (MCB) provides panel-circuit protection. Have the electrician confirm the required supply isolation and upstream protection for the whole installation. If a breaker opens, leave diagnosis and the decision to re-energize to the electrician.

Panel internals with ISI marked copper wiring on heavy duty lugs
Check the model and variant on the actual BOM-H enclosure. Keep its matching wiring diagram with the installation record.

BOM-H auto-off timer settings and operating mode

Choose and verify the auto-off duration

Start with a safe target level at the receiving tank and enough space below the overflow. Observe the actual starting water level and how long a normal run takes to reach the target. Check that the source can supply the pump throughout that period and follow the pump maker’s operating limits. Use what you observe to choose the first run duration with the installer.

VUKAR’s model matrix identifies RUN as the run-duration setting. Its unit is minutes.

Select the correct timed-stop mode and save the run duration with its unit. Use the key sequence for the panel revision and read back the saved value. Stay nearby for the first run. Note when the motor starts, when it stops and whether any protection indication appears during the run. VUKAR pump timer types

Recheck the setting when starting water level or delivery rate changes. A tank that starts with more water can reach the target earlier. If the tank must stop filling at a fixed level, use an appropriately installed automatic level-control system.

Auto off stop timer switching the motor off after a set duration
The timer controls elapsed run time. Watch the first stop and compare the actual time with the saved setting.

What matters at this site

Read the timer and the breaker as separate signals. If the pump stops and the MCB has operated, send that observation to the electrician before another start. If the display stays on and there is no protection indication, compare elapsed run time with the saved timer.

Keep the borewell and tank conditions in view during the first run. A borewell can deliver less water as the run continues. Ask the installer to check how delivery changes and follow the pump maker’s limits for operating time and starts. Record what the delivery looks like once the pipe has filled and the flow has settled.

How to use BOM-H after installation

Ask the installer to explain the conditions required before starting the pump. Check that the receiving tank or delivery point can accept water, that the source can supply the pump, and that you can use the normal stop control from a dry area. Keep the panel closed during the watched test.

  1. Confirm the mode and saved settings. Read the active setting and its unit with the installer. Agree on what should make the motor start and what should make it stop in this mode.
  2. Watch a normal start and stop. Compare the verified timer stop with the position of the MCB and the display. A successful timer run ends at the programmed duration without the breaker changing state.
  3. Ask about automatic restart. Confirm what the selected mode does when power returns, a timer becomes eligible, or a protection condition clears. Have the installer explain how to leave the equipment safely isolated for service.
  4. Record the observed result. Write down the motor rating, panel variant, selected mode, settings, display readings and actual stop or restart behavior. Keep the date and the correct diagram in the same record.

The installer should show the operator how to read the display and stop the pump safely. If the observed behavior differs from the planned sequence, keep the pump under supervision while the installer checks which setting or signal controls the motor. Watch the BOM-H product video

What to record during the first test

Before starting
Check the tank has room, note the starting level and read the saved duration with its unit.
As delivery begins
Record when the motor starts and when water reaches the delivery point so both observations are available.
Before the target level
Watch the rate of fill and keep the normal stop control accessible from a dry location.
When the timer expires
Compare the observed stop time with the saved duration. Record the display and final tank level.

If you need to make a second supervised test, start from a known water level and record changes in delivery. Keep both results with the saved duration. The record shows how sensitive the final tank level is to the starting level and flow, which helps you decide if a timed stop suits this site.

If the BOM-H pump stops or fails to start

An early shutdown with the breaker off calls for a circuit check. Ask the installer to identify which protective device operated and why before it is reset.

Write down the exact display code and what the pump did just before it appeared. VUKAR uses FOL for overload, FDR for dry run, HIU for high voltage and LOU for low voltage. If the same fault returns, ask the installer to diagnose the cause before operating again. VUKAR fault-code guide

Fault display indication showing motor error codes on the panel
Record the panel indication before the installer investigates the stop. Use the exact code and the time it appeared.

An observed flow change helps narrow down what happened. Record whether water delivery was steady, fell gradually, or stopped at the same instant as the motor. That detail helps the installer decide where to check first on a borewell installation.

Does the timer stop the pump at the same water level every time?

It stops the run after the selected time. The final tank level depends on how much water was in the tank at the start and how much water the pump delivered during the run.

What should the operator record at handover?

Keep the panel label, pump nameplate details, correct wiring reference and observed results together. Record the active mode and auto-off duration, watched stop test and fault checks. Add any conditions the installer checked, such as the normal display at startup and the expected behavior after power returns. When something changes later, this gives the technician the settings and conditions from a known working run.

Recommended BOM-H Settings: Protection Limits and Timed Stop