For a TPA-O 3 phase openwell / monoblock starter setup, set the source and receiving-tank float functions before enabling automatic filling. Have a licensed electrical contractor install the equipment and check the protection settings using the instructions for the installed revision.

TPA-O installation and equipment match

Read the motor nameplate before selecting the panel. Note the supply phase, rated voltage, horsepower (HP) and rated running current. Compare the installed panel’s model and rating with those details. The listed HP options help narrow the choice, and the electrician must check the actual supply and motor requirements.

The listed TPA-O options are rated up to 2 HP, 3 HP, 5 HP, 7.5 HP and 10 HP. Use the motor nameplate, operating current and starter requirements to confirm the correct variant. TPA-O specifications and options

A DOL starter, short for direct-on-line starter, applies the supply to the motor when the contactor closes. The contactor is the electrically operated switch in the motor circuit. Have the installer confirm the starting arrangement, protection, cable and phase sequence for this motor. Keep the supplied diagram with the panel.

Have the installer verify protective earthing, isolation and circuit protection. The supply must be isolated and verified off before anyone opens an enclosure or handles conductors. The electrician should check the phase conditions and verify normal motor operation before handing over automatic control. Central Electricity Authority safety regulations

TPA-O Serviceable Internal Wiring
Use the installed panel label and the matching VUKAR wiring diagram during commissioning.

TPA-O water-level settings

Where a source tank feeds an openwell or monoblock pump, the installer should identify which signal confirms water is available and which signal calls for filling. Label the two signal paths so a full receiving tank can be distinguished from a source that cannot supply water.

Set the intended low and full levels for the receiving tank. Have the installer position the float and confirm that it can move freely through those levels. Give it room away from the wall, pipes and inlet flow. Keep the full-level switching point below the overflow, with access for inspection.

Confirm the menu label, unit and save sequence in the instructions supplied for the installed unit.

Check which float state calls for a fill and which ends it. Observe the actual tank level, the indicated input and the motor response. Where a separate source sensor is part of the design, verify its role independently. Source water availability can affect whether the controller permits a start. VUKAR water-level controller guide

Read back the active level-control mode before leaving the pump on automatic. Confirm any run, rest or recovery settings the installer enabled. Observe the transition from a full tank to the next eligible demand so you can check that the float changes correctly in both directions.

TPA-O Automatic Water Level Controller
Test the tank signal on the installed system and observe how the pump responds.

How to use TPA-O after installation

At handover, have the installer show which indication means the motor has started and which control stops it in normal operation. Ask them to identify the separate isolation point for maintenance and to record normal operating readings with the enclosure closed.

Before the watched test, confirm that water is available and the receiving point can accept it. Keep the enclosure closed and make sure the normal stop control is safely accessible. Agree on what counts as a successful run before you enable automatic operation.

  1. Confirm the saved settings. Read the active mode and relevant values with the installer. Record what should permit a start and what should end the run.
  2. Observe the motor response. Prove a normal fill and the expected response when the source condition prevents pumping. Record each float state and the motor response.
  3. Verify recovery behavior. Ask the installer to document what happens after power returns or a protection condition clears. A permitted automatic restart can occur without a new button press.
  4. Keep a handover record. Record the TPA-O label, supply, motor rating, wiring reference and actual test results together.

What to record during commissioning

Tank calls for water
Record the actual water level, float indication, motor state and whether delivery begins.
Tank reaches the full mark
Record the observed switch point and motor stop. Check that the tank remains within the planned limit.
Source condition changes
Check the approved response when the source cannot supply water. Record any display indication or required wait.
Tank level falls again
Confirm the float moves freely and the next eligible demand is recognized in the active mode.

Observe each transition from a dry and safe location. If the actual response differs, record what the display, starter and pump each did. The installer can then trace whether a setting, an input, a protective condition or the motor circuit determined the outcome. TPA-O product video

Confirm the power circuit before testing automatic control

Have the electrician record the motor nameplate, panel variant and the protection devices fitted at the site. Ask them to check the supply and running readings under a normal load. The record should identify the readings on the panel and the measurements that were used to verify them. This gives a technician a reference if a phase or current indication appears later.

Show the operator where each check belongs

At handover, review the normal stop control, the isolation point and the display. Record which settings the operator is expected to use and which protection settings were checked by the installer. If the panel and motor are replaced at different times, keep both labels in the record so the new equipment can be checked as a combination.

Confirm access for future float checks

Keep the float location and the cable route in the site record. The operator should know how to observe the water level and where to report a stuck or damaged float. Ask the installer to explain the normal stop and the action to take if water continues to rise past the agreed point.

TPA-O troubleshooting after an unexpected stop

Read the display and note the elapsed run time, water delivery and the condition that preceded the stop. On applicable VUKAR controllers, FOL indicates overload, FDR indicates dry run, and HIU or LOU indicates high or low voltage. If a fault returns, have the cause diagnosed before another run. VUKAR fault-code guide

Record any phase-related indication as displayed. The electrician should investigate the supply and phase conditions before changing timing or protection. Use the installed model’s reset procedure after the fault has been addressed.

TPA-O Fault Display Indication
Keep the exact display indication and the time it appeared in the service record.

What should I record if the tank is low but the motor is idle?

Write down the actual level, the displayed float state, the mode and any fault or wait indication. Those observations help the installer determine which condition prevented the start.

When a pump, starter, float or water source changes, give the installer the previous commissioning record. Have them recheck the expected sequence and verify the changed installation before relying on automatic operation again.

Before the system is left on automatic

Review the normal start, normal stop and recovery behavior with the person who uses the pump. Keep the approved settings near the controller or in the site records. Where another control also affects the pump, identify its role and record who should be contacted if the motor responds differently from the documented sequence.

Record an unexpected event while it is fresh

If there is an unexpected stop or a delayed start, write down the time, the visible display and what the pump was doing. Also note any recent power interruption or change to the water source. Keep those details with the equipment model so the installer can check the relevant setting and conditions.

Recommended TPA-O Settings: Openwell Tank-Level Control and Cyclic Timing

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.