VUKAR DM-TP-CCCT-96 Motor Protection Meter: Installation and Clock Timer Settings
Mohit VekariaShare
For a DM-TP-CCCT-96 3 phase motor protection meter setup, verify the three-phase motor-control circuit, then check the meter clock and cyclic settings. Have a licensed electrical contractor install the equipment and check the protection settings using the instructions for the installed revision.
DM-TP-CCCT-96 installation and equipment match
Check the meter’s full model code and supply phase against the pump and starter. Gather the motor nameplate, the starter circuit diagram and information on any current sensor used in the installation. The installer should verify that the meter’s voltage and current inputs, supply and control output suit the actual circuit.
Use the three-phase motor protection meter with the compatible motor-control circuit for your installation. Give VUKAR the exact model and motor details when you request instructions. DM-TP-CCCT-96 specifications and options
The meter reads electrical conditions and controls a compatible starter or contactor circuit. Have the electrician verify the current-sensing arrangement and compare indicated values with appropriate measurements under normal load. Confirm the meter’s output and the starter’s response before enabling routine automatic operation.
Have the installer verify protective earthing, isolation and circuit protection. The supply must be isolated and verified off before anyone opens an enclosure or handles conductors. The electrician should check the phase conditions and verify normal motor operation before handing over automatic control. Central Electricity Authority safety regulations

DM-TP-CCCT-96 clock and cyclic timer settings
Give the electrician the motor ratings, the starter information and the current-sensing details. Before enabling scheduled operation, record the verified supply and motor readings. Confirm that the meter’s control output produces the expected response at the starter.
Set the time and verify the displayed day or date before entering an event. Confirm whether the installed mode uses individual clock events or an allowed operating window. Enter the intended times using the controls documented for the panel revision. Read the saved entries back with the installer and record their day selection.
Confirm the menu label, unit and save sequence in the instructions supplied for the installed unit.
Record cyclic ON and OFF values separately when repeating operation is enabled. Those values describe elapsed run and rest periods. The clock describes the time of day. Ask which rule applies when a run reaches the end of an allowed window, then watch the installation at a planned boundary. VUKAR timer types guide
Check the displayed time and saved schedule after a controlled power-return test if the installer can safely perform one. Record whether the chosen mode continues, waits or requires an operator command. Use the exact revision instructions to understand the result and make it part of the handover.

How to use DM-TP-CCCT-96 after installation
Keep the motor nameplate values, normal-load measurements and protection settings with the wiring reference. Have the installer explain how to identify a meter output, a motor running indication and a protection stop. Record them separately during the first watched test.
Before the watched test, confirm that water is available and the receiving point can accept it. Keep the enclosure closed and make sure the normal stop control is safely accessible. Agree on what counts as a successful run before you enable automatic operation.
- Confirm the saved settings. Read the active mode and relevant values with the installer. Record what should permit a start and what should end the run.
- Observe the motor response. Watch the meter and starter at the clock boundary. If repeating operation is enabled, check the run/rest intervals inside the selected mode.
- Verify recovery behavior. Ask the installer to document what happens after power returns or a protection condition clears. A permitted automatic restart can occur without a new button press.
- Keep a handover record. Record the DM-TP-CCCT-96 label, supply, motor rating, wiring reference and actual test results together.
What to record during commissioning
- Before the window opens
- Record the displayed day, time and motor state. Check whether the selected mode is waiting for an eligible period.
- At an eligible start
- Compare the scheduled time, controller indication and actual pump start. Record any source or tank condition that affects permission.
- At a cyclic stop
- If cyclic control is active, time the actual run and rest periods. Check the display before attributing the stop to the clock.
- As the window ends
- Record the motor state and verify how the next allowed event is shown on the display.
Observe each transition from a dry and safe location. If the actual response differs, record what the display, starter and pump each did. The installer can then trace whether a setting, an input, a protective condition or the motor circuit determined the outcome. VUKAR manuals and connection diagrams
Check the measurement and the control output separately
Ask the electrician to verify the display under stable pump operation. Record the motor nameplate data and the operating readings used to check the meter. Check the output indication during the same test and observe whether the starter follows the command. Those two observations help separate a measurement or setting issue from a starter circuit issue.
Keep protection settings tied to the actual motor
Have the installer document the approved current and voltage limits and the associated delays for the installed motor. The meter’s timer settings describe how a run is requested or ended. The protection values govern the response to abnormal readings. Keep both records with the diagram and revisit them if the motor, sensor or starter changes.
Hand over a normal set of readings
With the pump supplying water normally, have the installer write down the displayed values and the point in the operating sequence when they were taken. Include the active mode and the actual motor state. A technician investigating a later shutdown can compare those readings against the same part of a known working run.
Keep a record of the active schedule
Write down the date of the test, the intended start and stop times, and the settings that were enabled. Have the operator read back the day selection and the normal display before leaving the site. If the schedule is later revised, keep the earlier values in the service record so the next person can see what changed.
DM-TP-CCCT-96 troubleshooting after an unexpected stop
Read the display and note the elapsed run time, water delivery and the condition that preceded the stop. On applicable VUKAR controllers, FOL indicates overload, FDR indicates dry run, and HIU or LOU indicates high or low voltage. If a fault returns, have the cause diagnosed before another run. VUKAR fault-code guide
Record any phase-related indication as displayed. The electrician should investigate the supply and phase conditions before changing timing or protection. Use the installed model’s reset procedure after the fault has been addressed.

Why did the motor stay off at the time entered?
Read the actual clock, day selection, enabled event and operating mode. Ask the installer to check any active tank, source or protection condition if the clock is correct. Record the display before you change a saved event.
When a pump, starter, float or water source changes, give the installer the previous commissioning record. Have them recheck the expected sequence and verify the changed installation before relying on automatic operation again.
Before the system is left on automatic
Review the normal start, normal stop and recovery behavior with the person who uses the pump. Keep the approved settings near the controller or in the site records. Where another control also affects the pump, identify its role and record who should be contacted if the motor responds differently from the documented sequence.
Record an unexpected event while it is fresh
If there is an unexpected stop or a delayed start, write down the time, the visible display and what the pump was doing. Also note any recent power interruption or change to the water source. Keep those details with the equipment model so the installer can check the relevant setting and conditions.
Recommended DM-TP-CCCT-96 Settings: Three-Phase Protection, Clock and Cyclic Timing