For the DEV-G1 recommended parameter settings, start with the overhead tank’s low and full switching points on the three-phase borewell installation, then pick RUN/RST for the source and motor. Commission the float and the repeat cycle in separate watched tests.
Start with the installed unit
Write down the model and revision from the unit label, the motor nameplate, the type of starter and the normal operating mode. Keep those details together. Two devices with similar front panels can have different menu options. The correct model guide and the current installation record are the references for any actual setting.
Use the product page to identify available functions and the installed revision’s guide for units, menu names and how the selected mode operates.
If the pump, sensor or operating mode changes, keep the previous record. Mark the date of the change and have the installer observe the revised sequence before relying on automatic operation.

Observe a borewell installation with one float
The listed single-float arrangement uses the overhead tank’s float for the tank signal. Record where the float changes state and how the installer has arranged protection for the water source. A low overhead tank says that the destination needs water. It gives no direct observation of the water available down the borewell.
Watch the water arriving at the tank when the motor starts and again near the end of a normal run. If the flow weakens, note when it changes. Compare it with the reading taken at the first fill or in a different season. The installer can use the record to decide whether to review borewell recovery, the chosen run time or the reason for a protection stop.
Read the real water level and the controller state
Mark the observed low and full switching points with the installer while the sensor is in its normal installed position. Write down the physical water level, the state shown on the controller and when the motor actually starts or stops. If those three observations disagree, keep the evidence and ask the installer to review the level input and the selected mode.
A level sensor can report that the receiving tank needs water. The start can still depend on source conditions, timing and protection. During a supervised test, observe a valid request and the documented full-level stop. If there is a source input, ask the installer to demonstrate its low-water response using the prescribed method while keeping the pump protected.
Choose RUN and RST from the water supply
RUN is the elapsed pump-on time. RST is the planned pause between cyclic runs in the selected mode. Choose RUN based on how long the source can deliver a steady flow, the space available where the water goes, and the motor maker’s permitted operating conditions. For RST, consider how long the source needs to recover and any minimum time between starts for the motor.
To estimate starts per hour during an uninterrupted cycle, add RUN and RST in minutes and divide 60 by the total. For example, 10 minutes on and 20 minutes off gives about two planned starts per hour. These are example values. Include any separate starts from other controls, power recovery or fault recovery when the installer reviews the motor’s actual start frequency.
What to observe on this model
Use the single overhead float supplied for the three-phase borewell arrangement. If the motor stops while the tank remains below the observed full point, compare elapsed time with the approved RUN and photograph the display. Test the float’s low-to-full response and the normal timer pause separately. A full tank, a normal cyclic pause and a protection stop can all leave the motor off.
Record the sensor state and the real tank level together. When the tank is low but the motor stays off, note source availability, timing and protection separately before asking the installer which condition applies.

Use the motor and supply limits
Have the electrician match the motor’s nameplate and the controller’s sensing arrangement before setting overload, dry-run or voltage protection. A setting copied from a different pump can be unsuitable even when the pumps have the same horsepower. Ask the electrician to record the approved values, their units and which manual or measurement they used. Keep the previous approved values in the record if a setting needs to be changed.
Observe normal operation from a dry and safe place with the enclosure closed. Changes to wiring, live measurements, current sensing, protection and automatic restart belong with the installer. If a fault reappears, record the indication and stop using automatic operation until the cause has been assessed. Use the product instructions and the applicable electrical safety rules for installation and service.
Measure how much water a run actually delivers
If the flow is steady, multiply litres per minute at the delivery point by the number of minutes the pump runs. At 25 litres per minute, 10 minutes gives about 250 litres. The example assumes steady flow throughout. If the source weakens during the run, measure the volume received across the whole run before relying on that estimate.
For a receiving tank, use the space that is free at the beginning of the run. For irrigation, measure under the outlet arrangement you usually use because opening or closing outlets may affect delivery. The owner’s water delivery record and the electrician’s motor limits help determine a duration that suits the site.
Follow the command to the pump
A controller can show a request while the motor is still off. A starter switches motor power when the control circuit permits it. Observe the display, the starter’s visible response and water delivery as separate facts. These observations give the electrician a place to start without asking you to open the enclosure or touch conductors.
If the display shows that the pump should be running but there is no water, write down whether you could see or hear the motor run from a safe location. If the motor runs but delivery is absent or weak, record how long it ran and when the flow changed. Keep the display photo and the times together so the installer can compare them with the actual settings.
What to record
| Water and source | Actual tank level or water delivery, and when it changed. |
|---|---|
| Controller | Active mode, saved value or visible indication and its unit. |
| Starter and motor | Actual start and stop, and first permitted restart where applicable. |
Make a two-line event record. In the first line write the expected result and the setting that should produce it. In the second line write the actual time, visible indication and observed water delivery. If an observation is missing, leave that field blank and tell the installer.

Prepare the installation for a watched test
Choose a time when the source has water, the receiving point has room for delivery and the operator can observe from a safe place. Agree with the installer on what counts as a successful start and stop. Use the normal operating controls. Have the installer handle any changes to the electrical circuit or protection settings.
Tell everyone working near the pump when an automatic start could occur. Keep the enclosure closed while observing the display. If the observed behavior differs from the manual or the approved record, stop the test in the normal safe way and write down what happened before any values are changed.
Change one condition between watched tests
Begin a test with the mode and relevant settings written down. Change one approved timing or operating condition at a time with the installer. Then observe the pump from the start permission through the actual stop. If two settings change together, a normal or unexpected result is harder to explain later.
Use one record for the expected result and one for what really happened. For a clock event include the active day and time. For a level event include the physical water level and display. For a cyclic stop include actual elapsed minutes. When an event repeats, compare those records before requesting another setting change.
Keep a record another operator can use
Write the model and revision, the motor details, the saved mode and the approved values at the top of the record. Under that, note actual start and stop times, any physical tank level or source condition, the display at the time and the result of the test. If the installed setup uses automatic restart, include the first permitted restart and what triggered it.

Model guide and support