Contract Demand & Load Expansion Guide

Verified 2026-09-05 · By VUKAR Editorial Team

Can the approved demand cover your expansion?

Read twelve months of demand records before ordering a new machine. Spare contract demand is only a billing-and-approval screen. It does not prove that the transformer, cables, or switchboard can carry the added load.

  • Match units first: compare kVA with kVA, or kW with kW.
  • Use recorded maximum demand, not monthly energy units.
  • Add an explicit new-load scenario; keep assumptions visible.
  • Ask the utility and a qualified electrical professional before committing to expansion.

Four fields that must stay separate

Field Plain meaning Where to check
Approved demand The load agreed with the utility; use its exact term and unit. Agreement, utility record, or bill[S1] [S4]
Maximum demand The highest demand recorded using the utility's stated interval. Monthly demand record[S1] [S4]
kWh Energy used over time, not peak load. Energy section of the bill[S1] [S4]
Added demand The proposed extra load running in the chosen scenario. Exact equipment inputs and reviewed plan[S1] [S4]

Collect one complete evidence pack

  • Twelve consecutive bills or demand reports, including quiet and busy months.
  • The current approved demand, unit, tariff category, and agreement details.
  • Any meter change, shutdown, unusual production month, or missing reading.
  • Exact model inputs for the proposed machines, their operating hours, and what may run together.
  • The current utility tariff and change process for this consumer number. Do not reuse another site's rate.
  • A qualified review of the physical installation, kept separate from the demand worksheet.
[S1] [S2] [S3]

A simple example: headroom is not permission

  • Illustration only: approved demand is 100kVA; the highest recorded demand is 80kVA.
  • Simple subtraction leaves 20kVA before the proposed change.
  • If the new simultaneous-load scenario adds 15kVA, the screen becomes 95kVA, leaving 5kVA.
  • That result assumes the new demand overlaps the old peak. Different operating patterns need a separate, clearly labelled case.
  • It does not allow a purchase, connection, or overload. Starting loads, site limits, and utility conditions still need review.
[S1] [S3] [S4]

What can make the result misleading?

  • Wrong units: kW and kVA are different fields. Do not silently treat them as equal.
  • Energy mistaken for demand: a monthly kWh total cannot replace a maximum-demand reading.
  • An unusual year: a long shutdown can make old peaks look smaller than normal use.
  • Unclear overlap: adding every machine rating may differ from actual simultaneous use.
  • Meter interval differences: BRPL's FAQ describes a 30-minute average for its maximum-demand definition. Ask your own utility; do not copy that interval nationwide.
  • A short peak or poor power quality may need a site measurement study beyond the bill.
[S1] [S4]

Read the tariff before estimating savings

  • Ask which demand measure is billed, in which unit, and under which category.
  • Ask whether the current tariff has minimum billing demand, excess-demand charges, or revision conditions. Obtain the applicable clauses.
  • Separate the new equipment price, utility charges, and premises electrical work.
  • Do not promise savings from reducing the agreed demand. A lower limit can affect the next expansion.
  • This guide quotes no current Gujarat tariff rate: the current document could not be retrieved reliably for this revision.
[S1] [S2]

Ask before buying the new machine

  • What are the exact model's electrical input and starting requirements?
  • Which existing loads will run with it? Is that scenario documented?
  • Does the demand record cover a normal full year?
  • Which present tariff clause governs my category and requested change?
  • Does the utility need a load or demand-change application?
  • Who checks transformer, conductors, protection, and switchboard capacity?
  • What equipment or service changes are excluded from the quotation?
[S1] [S2] [S3] [S4]

Have the installation checked before use

Safety / Verify First

Do not open live equipment, change wiring, or replace protection using this guide. Use a qualified electrical professional and the applicable utility process.[S3]

The final design must cover cables, protection, earthing, equipment ratings, inspection, and safe commissioning. A calculator result is not permission to connect.[S3]

Quick questions

Can I subtract maximum demand from approved demand?

Yes, as an arithmetic screen when both figures use matching units and definitions. It is not a safety or utility approval.[S1] [S3]

Why use twelve months?

This guide uses a full-year planning window to include different operating periods. It is not a claim that every utility requires twelve months.[S1]

Can the planner choose my contract demand?

No. It organises the supplied figures. The current agreement, tariff, operating plan, and professional review decide the request.[S1] [S2] [S3]

What if a month is missing?

Get the missing record or clearly label the screen incomplete. Do not fill the gap with an invented peak.[S1]

References used for this guide
  1. BSES Rajdhani FAQ: sanctioned load and maximum demand — BSES Rajdhani Power Limited; accessed 2026-09-05
  2. Load Change and online registration — BSES Yamuna Power Limited; accessed 2026-09-05
  3. CEA Safety Regulations 2023 — Central Electricity Authority; accessed 2026-09-05
  4. Load studies with Fluke power loggers — Fluke Corporation; accessed 2026-09-05
Back to blog