VUKAR TPM-A three-phase DOL starter panel product features

3 Phase DOL Starter Panel Supplier for Hosur

Mohit Vekaria

Replacing a 3 phase DOL starter panel for a utility pump in Hosur? Consider VUKAR TPM-A once your electrician confirms that the existing motor uses direct-on-line starting and that the selected variant matches it.

Match the replacement to the pump tag

SIPCOT describes a planned treated-water facility covering Hosur and other estates. A separately filed Hosur record documents an allottee’s agreement for water from the industrial complex. These records make the supply connection a site-specific detail. If an expansion adds a new inlet, identify which internal pump is changing and which equipment stays. Ask whether the existing starter is still serving a transfer pump, a different motor or a standby line. The model decision follows that equipment list.

SIPCOT Hosur industrial water project · Hosur industrial water agreement record

One motor plate, one quote

Two pumps can have the same HP label and use different starting arrangements. Have the electrician write the existing start method on the job card. If the old panel uses a different method, send that detail before asking for TPM-A.

Condition What to agree
Plant pump label Use the tag from the closed panel and motor
Starting method Have the electrician record it before ordering
Return to service Agree who signs off on manual start, stop and fault indication

Before you order

Take a readable photograph of the motor label and the outside of the old panel. Include the pump’s job and the settings or alarms that the operator can see. Ask the electrician to identify the starting method and write down the motor details the supplier needs. Keep each photo with the pump ID so it cannot be mixed with a spare or with a similar motor elsewhere on the site. If a label is illegible, ask for an assessment before choosing a variant. When the equipment arrives, compare its exact code against the approved quote before the installer starts work.

Related guide · DOL Starter Panel: Three-Phase Digital Controls and Selection

VUKAR TPM-A product detail
VUKAR TPM-A product detail

Product and quote

Ask for a price split between the panel, any external protection required by your site, fitting and the handover test. A like-for-like quote should state whether the old start and stop controls will be retained.

Make a list of what the existing panel does on a good day. Include the manual start and stop, the signals it already receives and which protective functions the electrician has checked. Then write the one job the new device must add. If the pump already fails in manual mode, arrange a diagnosis before comparing automation prices. A quote for an add-on needs to say which existing parts stay in service and who will verify them. A full-panel quote needs to say what it replaces. Use those two lists to spot changes that would otherwise only surface during fitting.

Compare the installed job, using the same scope for each seller. Ask for the exact model and variant, the included parts, the cost of field cable and any mounting work. Ask who supplies the sensors and who returns if a setting needs correction. A lower panel price can leave out the part of the job that brings the pump back into service. Write the test you expect alongside the price. That makes it clear whether one supplier has quoted equipment only and another has also included fitting, setting up the controls and demonstrating them to the person who operates the pump.

Ask for a quote

Back to blog