News

MOA-T recommended parameter settings cover for monoblock tank levels and weekday scheduling.

Recommended MOA-T Settings: Monoblock Tank Levels and Clock Scheduling

Confirm the double-float low and full responses, then save the controller clock and enabled weekdays for the commissioned schedule. Record cyclic timing and any applicable power-return delay on separate lines.

Recommended MOA-T Settings: Monoblock Tank Levels and Clock Scheduling

Confirm the double-float low and full responses, then save the controller clock and enabled weekdays for the commissioned schedule. Record cyclic timing and any applicable power-return delay on separate lines.

MOA-H recommended parameter settings cover for monoblock switching, run/rst and ast.

Recommended MOA-H Settings: Tank Switching Points, RUN/RST and AST

Document the double-float low and full switching points, the RUN/RST minutes for the approved cycle, and AST in seconds if automatic starting after power return is commissioned.

Recommended MOA-H Settings: Tank Switching Points, RUN/RST and AST

Document the double-float low and full switching points, the RUN/RST minutes for the approved cycle, and AST in seconds if automatic starting after power return is commissioned.

MOA-B recommended parameter settings cover for monoblock tank control and cyclic timing.

Recommended MOA-B Settings: Monoblock Tank-Level Control and Cyclic Timing

Record the double-float installation’s low and full tank responses, the selected operating mode, and the run/rest times if the installation uses cycling. Keep the approved protection limits with those observations.

Recommended MOA-B Settings: Monoblock Tank-Level Control and Cyclic Timing

Record the double-float installation’s low and full tank responses, the selected operating mode, and the run/rest times if the installation uses cycling. Keep the approved protection limits with those observations.

OPM-W recommended parameter settings cover for openwell level indication, cycling and protection.

Recommended OPM-W Settings: Level Indication, Run/Rest and Protection

Record the actual tank level and its indication, the commissioned RUN/RST pair, and any applicable AST delay. Keep the motor’s overload, dry-run and voltage settings beside that record.

Recommended OPM-W Settings: Level Indication, Run/Rest and Protection

Record the actual tank level and its indication, the commissioned RUN/RST pair, and any applicable AST delay. Keep the motor’s overload, dry-run and voltage settings beside that record.

OPM-V recommended parameter settings cover for openwell level display, run/rest and ast.

Recommended OPM-V Settings: Level Display, Cyclic Timing and Start Delay

Confirm that the level display agrees with known tank levels, then record RUN and RST and any commissioned AST delay. Keep the observed display and the pump’s cyclic behavior as...

Recommended OPM-V Settings: Level Display, Cyclic Timing and Start Delay

Confirm that the level display agrees with known tank levels, then record RUN and RST and any commissioned AST delay. Keep the observed display and the pump’s cyclic behavior as...

OPM-T recommended parameter settings cover for openwell clock schedule and cyclic timing.

Recommended OPM-T Settings: Openwell Clock Schedule and Cyclic Timing

Set the current controller clock and enabled weekdays before checking the approved operating period. Record RUN and RST separately and note the applicable AST delay and commissioned protection values.

Recommended OPM-T Settings: Openwell Clock Schedule and Cyclic Timing

Set the current controller clock and enabled weekdays before checking the approved operating period. Record RUN and RST separately and note the applicable AST delay and commissioned protection values.

Read VUKAR guides on pump controls and starter panels. Our products come from manufacturer Vukar Automation in Rajkot, Gujarat.