Recommended MOA-H Settings: Tank Switching Points, RUN/RST and AST
Mohit VekariaShare

MOA-H recommended parameter settings are a commissioning record for your exact single-phase monoblock pump starter. Document the double-float low and full switching points, the RUN/RST minutes for the approved cycle, and AST in seconds if automatic starting after power return is commissioned.

What belongs on the first-installation checklist?
A monoblock system has a receiving tank and an automatic fill arrangement. After a supply interruption the owner may see a low tank and a waiting pump. Record the actual level, the time power came back and the commissioned automatic-start behavior before drawing conclusions.
Write the panel model and variant as they appear on the label. Add the controller revision and the motor’s rated current and voltage from the nameplate or pump paperwork. The model tells you which functions the panel offers. The actual motor, supply, water source and operating mode determine the settings that belong in the record. Use the revision-matched instructions for the menu labels and save procedure. VUKAR product manuals and parameter reference
| Setting | What it does | What to record |
|---|---|---|
| OL / OLT | Overload current threshold and delay before an overload trip. | Approved amps (A) and seconds (s). |
| DR / DRT | Low-current threshold for dry-run detection and its own trip delay. | Approved amps and seconds. |
| HIU / LOU | High and low supply-voltage limits. | Both limits in volts (V). |
| Tank inputs and mode | The commissioned level-control arrangement makes a fill request and ends it at the full point. | Actual low and full response, double-float layout, and selected mode. |
| RUN / RST | Run and rest lengths for the commissioned repeating cycle. | Both durations in minutes and the exact labels shown. |
| AST | Applicable delay after power returns before an eligible automatic start. | Approved seconds and the conditions the installer confirmed. |
Read current limits and delays as pairs
OL and DR are current limits. OLT and DRT are delays. With overload protection, the controller looks for current above the approved overload limit for the associated time. With dry-run protection, it looks for current below its approved threshold for the corresponding time. A short change in the current reading and a continuing condition tell the controller different things. Record the limit and delay together so the next installer can see both parts of the decision.

Keep the two voltage limits in the same record, with HIU for the upper limit and LOU for the lower limit. A voltage shown on the front display is the reading at that moment. Write a measured reading and a saved limit in different fields. If a protection trip repeats, note the displayed indication and the conditions around the stop so an installer can investigate the motor, supply or water source.
Have a qualified installer choose protection values using the actual motor and supply. Values from a different pump or controller revision can mislead even when the model name looks familiar. Ask the installer to record who approved the final limits and the date they were set. For wiring and work inside the enclosure, use a licensed electrical contractor and have the supply isolated and verified dead. Central Electricity Authority safety regulations

VUKAR product
MOA-H Single-Phase Starter Panel
For compatible monoblock pumps. See the product gallery and model features for monoblock switching, run/rst and ast.
View MOA-H ↗Monoblock switching, RUN/RST and AST
Give the float response, cyclic rest and power-return delay three separate entries. Where a delay is part of the approved setup, label the event it follows. The installer can then compare a tank request with the timer that was active when the pump was observed.
For the tank control test, the installer observes the actual water levels with the installed double-float arrangement in service. Record when the system recognizes a low demand and what happens at the full point. Keep the tank, sensor layout and selected mode on the same line. If the source cannot supply the pump during the test, record that condition before interpreting what happened on the receiving side.
Record RUN and RST using the exact labels shown on your installed controller. In a commissioned repeating cycle, record both run and rest in minutes. Observe a complete run, the normal stop, the rest period and the next permitted start. Use the pump maker’s operating limits and the installer’s observations of water delivery when choosing the cycle. If another mode uses a time differently, record that mode separately.
If power-return automatic starting is commissioned, record AST in seconds with the selected mode and the conditions for an eligible start. Ask the installer to document the behavior safely. Keep clear of the equipment during any approved restart test. A power-return delay should have its own entry even when a cyclic rest delay is also present.

Keep the other applicable values as commissioned
Keep the documented defaults for the exact controller revision or the values the installer already commissioned. If TRQ appears on your panel, leave its starting torque time at that approved value. Keep current-sensor selection, marked CTS where applicable, and current or voltage calibration as commissioned. Those values belong with the installed hardware and measurements. Have the installer review changes using the matching instructions.
The approved restart settings may include a fault delay, memory after an outage or lockout behavior. Ask the installer to write down which options apply and what can happen after a supply interruption or fault. Keep the recorded mode and labels with the values so they still make sense at the next service visit.
Write down what happened during the watched run
A pump that appears to wait after power returns may be following the installed start delay or another permitted-start condition. Note the elapsed time, mode, actual tank level and any fault and send those details to the installer.

Keep three things together for handover. First, identify the panel variant, revision, motor and water source. Second, copy the saved settings and units, including the mode that was tested. Third, write when the test started and stopped, what the display showed and any unexpected event. Date the record and add the installer’s name. This gives you a baseline if a motor, sensor or water source changes later.
If the values already in the panel and the settings on an old service sheet differ, keep both records until the installer has identified the current approved set. A note such as “read from panel” or “approved after test” tells you which numbers were observed and which ones were accepted for the installation. Leave a missing unit or value blank until it can be confirmed.
When reporting a problem, send the panel model and revision, motor rating, current mode, display code and the time of the event. Include the saved timer or protection setting that relates to the event and note any recent change in the installation. VUKAR technical support
Review the record again after the pump has worked under its usual conditions. Note any difference between the first test and later operation, including a change in flow, demand or the supply. Keep that observation as a separate dated entry. If an installer changes a setting, keep the reason for the change and the result of the next supervised run with the new record.
Use the MOA-H installation and setup guide for the panel-specific setup sequence and the VUKAR guide to pump timer types for how the different timing modes behave. At the end of the visit, keep the approved settings sheet where the next owner or technician can find it.