TPM-H recommended parameter settings cover for dol protection and cyclic timing.

Recommended TPM-H Settings: DOL Protection Limits and Cyclic Timing

Record the approved overload, dry-run and voltage limits, then read back RUN/RST and the applicable AST delay. Observe the complete commissioned cycle and keep the built-in MCB’s visible state separate...

Recommended TPM-H Settings: DOL Protection Limits and Cyclic Timing

Record the approved overload, dry-run and voltage limits, then read back RUN/RST and the applicable AST delay. Observe the complete commissioned cycle and keep the built-in MCB’s visible state separate...

TPM-A recommended parameter settings cover for three-phase dol protection and start delay.

Recommended TPM-A Settings: DOL Protection, RUN/RST and Start Delay

Record the commissioned DOL motor protection limits, RUN/RST minutes and AST seconds where the automatic-start mode uses it. Have the installer confirm normal three-phase motor operation before enabling automatic starts.

Recommended TPM-A Settings: DOL Protection, RUN/RST and Start Delay

Record the commissioned DOL motor protection limits, RUN/RST minutes and AST seconds where the automatic-start mode uses it. Have the installer confirm normal three-phase motor operation before enabling automatic starts.

TPB-T recommended parameter settings cover for tank control and weekday scheduling.

Recommended TPB-T Settings: Borewell Tank Levels, Clock Schedule and RUN/RST

Confirm the tank’s low and full responses, set the clock and enabled weekdays, and record RUN/RST and any applicable AST for the commissioned mode. Observe the selected schedule before handover.

Recommended TPB-T Settings: Borewell Tank Levels, Clock Schedule and RUN/RST

Confirm the tank’s low and full responses, set the clock and enabled weekdays, and record RUN/RST and any applicable AST for the commissioned mode. Observe the selected schedule before handover.

TPB-H recommended parameter settings cover for borewell low and full switching points.

Recommended TPB-H Settings: Borewell Tank Switching Points and Run/Rest

Document the tank sensor’s low and full responses, then record the approved run/rest intervals and motor protection settings. Have the installer confirm normal three-phase operation before enabling automatic starts.

Recommended TPB-H Settings: Borewell Tank Switching Points and Run/Rest

Document the tank sensor’s low and full responses, then record the approved run/rest intervals and motor protection settings. Have the installer confirm normal three-phase operation before enabling automatic starts.

TPA-O recommended parameter settings cover for openwell tank switching and cycling.

Recommended TPA-O Settings: Openwell Tank-Level Control and Cyclic Timing

Record the actual low and full tank responses and selected filling mode. Where the commissioned installation uses cyclic timing, record the run and rest intervals along with the installer-approved protection...

Recommended TPA-O Settings: Openwell Tank-Level Control and Cyclic Timing

Record the actual low and full tank responses and selected filling mode. Where the commissioned installation uses cyclic timing, record the run and rest intervals along with the installer-approved protection...

TPA-B recommended parameter settings cover for borewell tank levels, run/rest and ast.

Recommended TPA-B Settings: Three-Phase Tank Levels, RUN/RST and AST

Verify the low and full switching points, save RUN and RST for the commissioned cycle, and record AST where the selected automatic-start mode uses it. Have the installer confirm the...

Recommended TPA-B Settings: Three-Phase Tank Levels, RUN/RST and AST

Verify the low and full switching points, save RUN and RST for the commissioned cycle, and record AST where the selected automatic-start mode uses it. Have the installer confirm the...