VUKAR DEV-K3 Digital Auto Switch: Installation and Clock Timer Settings
Mohit VekariaShare
For a DEV-K3 single phase digital auto switch setup, check the 1–35 A single-phase application, then set the clock and prove one intended start and stop. Have a licensed electrical contractor install the equipment and check the protection settings using the instructions for the installed revision.
DEV-K3 installation and equipment match
Read the motor nameplate and identify the existing starter. Record phase, rated voltage, motor HP and operating current. Give the installer the starter make, model and available control-circuit documentation. These details help establish whether the auto switch and the existing motor-switching equipment can be used together.
VUKAR lists DEV-K3 for a 1–35 A single-phase application. Have the installer confirm the operating current and starter arrangement together. DEV-K3 specifications and options
Confirm which equipment switches the motor power and which circuit carries the run command. A contactor is the electrically operated motor switch. The electrician should check the device’s current-sensing arrangement, control voltage and connection diagram for the particular starter before energizing.
Have the installer verify protective earthing, isolation and circuit protection. The supply must be isolated and verified off before anyone opens an enclosure or handles conductors. The electrician should verify the single-phase supply and existing motor-control circuit before handing over automatic operation. Central Electricity Authority safety regulations

DEV-K3 clock and cyclic timer settings
On a retrofit, write down which local controls still have authority over the starter. A valid clock entry can coincide with an external stop condition. Record the device state and the starter response together while you test the schedule.
Set the time and verify the displayed day or date before entering an event. Confirm whether the installed mode uses individual clock events or an allowed operating window. Enter the intended times using the controls documented for the panel revision. Read the saved entries back with the installer and record their day selection.
Confirm the menu label, unit and save sequence in the instructions supplied for the installed unit.
Record cyclic ON and OFF values separately when repeating operation is enabled. Those values describe elapsed run and rest periods. The clock describes the time of day. Ask which rule applies when a run reaches the end of an allowed window, then watch the installation at a planned boundary. VUKAR timer types guide
Check the displayed time and saved schedule after a controlled power-return test if the installer can safely perform one. Record whether the chosen mode continues, waits or requires an operator command. Use the exact revision instructions to understand the result and make it part of the handover.

How to use DEV-K3 after installation
At handover, compare what the device shows with what the starter and motor actually do. If a control signal changes and the contactor does not respond as expected, record both observations. The electrician can check the control path before any timer setting is changed.
Before the watched test, confirm that water is available and the receiving point can accept it. Keep the enclosure closed and make sure the normal stop control is safely accessible. Agree on what counts as a successful run before you enable automatic operation.
- Confirm the saved settings. Read the active mode and relevant values with the installer. Record what should permit a start and what should end the run.
- Observe the motor response. Verify the real time and the enabled day, then observe the starter through the selected window. Test any repeating interval separately.
- Verify recovery behavior. Ask the installer to document what happens after power returns or a protection condition clears. A permitted automatic restart can occur without a new button press.
- Keep a handover record. Record the DEV-K3 label, supply, motor rating, wiring reference and actual test results together.
What to record during commissioning
- Before the window opens
- Record the displayed day, time and motor state. Check whether the selected mode is waiting for an eligible period.
- At an eligible start
- Compare the scheduled time, controller indication and actual pump start. Record any source or tank condition that affects permission.
- At a cyclic stop
- If cyclic control is active, time the actual run and rest periods. Check the display before attributing the stop to the clock.
- As the window ends
- Record the motor state and verify how the next allowed event is shown on the display.
Observe each transition from a dry and safe location. If the actual response differs, record what the display, starter and pump each did. The installer can then trace whether a setting, an input, a protective condition or the motor circuit determined the outcome. VUKAR manuals and connection diagrams
Trace the start request through the existing starter
Ask the electrician to record where the auto switch enters the starter control circuit and which local controls can stop the motor. With the enclosure closed, observe a normal start and stop. Read the controller state and then verify the motor response. If they disagree, the installer can use the circuit documentation to locate the point that needs checking.
Record the current range and sensing arrangement
Write down the installed device code, the motor nameplate current and the normal running value observed during the test. Have the electrician confirm the current-sensing hardware for that revision and check that the display is consistent with the actual installation. If the motor or starter is changed later, recheck the combination before reusing the earlier settings.
Agree on recovery after an interruption
During handover, ask which states allow another run after a stop or power loss. Keep the approved mode and any waiting period in the record. The operator should know whether to expect a restart when a timer becomes eligible and which control must be used when the equipment needs to stay stopped for service.
Keep a record of the active schedule
Write down the date of the test, the intended start and stop times, and the settings that were enabled. Have the operator read back the day selection and the normal display before leaving the site. If the schedule is later revised, keep the earlier values in the service record so the next person can see what changed.
DEV-K3 troubleshooting after an unexpected stop
Read the display and note the elapsed run time, water delivery and the condition that preceded the stop. On applicable VUKAR controllers, FOL indicates overload, FDR indicates dry run, and HIU or LOU indicates high or low voltage. If a fault returns, have the cause diagnosed before another run. VUKAR fault-code guide

Why did the motor stay off at the time entered?
Read the actual clock, day selection, enabled event and operating mode. Ask the installer to check any active tank, source or protection condition if the clock is correct. Record the display before you change a saved event.
When a pump, starter, float or water source changes, give the installer the previous commissioning record. Have them recheck the expected sequence and verify the changed installation before relying on automatic operation again.
Before the system is left on automatic
Review the normal start, normal stop and recovery behavior with the person who uses the pump. Keep the approved settings near the controller or in the site records. Where another control also affects the pump, identify its role and record who should be contacted if the motor responds differently from the documented sequence.
Record an unexpected event while it is fresh
If there is an unexpected stop or a delayed start, write down the time, the visible display and what the pump was doing. Also note any recent power interruption or change to the water source. Keep those details with the equipment model so the installer can check the relevant setting and conditions.
Recommended DEV-K3 Settings: Clock Schedule and Cyclic Timer Settings