VUKAR DEV-K1 Digital Auto Switch: Installation and Cyclic Timer Settings
Mohit VekariaShare
For a DEV-K1 single phase digital auto switch setup, match the 1–35 A single-phase application to a compatible starter and verify the run/rest cycle. Have a licensed electrical contractor install the equipment and check the protection settings using the instructions for the installed revision.
DEV-K1 installation and equipment match
Read the motor nameplate and identify the existing starter. Record phase, rated voltage, motor HP and operating current. Give the installer the starter make, model and available control-circuit documentation. These details help establish whether the auto switch and the existing motor-switching equipment can be used together.
VUKAR lists DEV-K1 for a 1–35 A single-phase application. Have the installer confirm the operating current and starter arrangement together. DEV-K1 specifications and options
Confirm which equipment switches the motor power and which circuit carries the run command. A contactor is the electrically operated motor switch. The electrician should check the device’s current-sensing arrangement, control voltage and connection diagram for the particular starter before energizing.
Have the installer verify protective earthing, isolation and circuit protection. The supply must be isolated and verified off before anyone opens an enclosure or handles conductors. The electrician should verify the single-phase supply and existing motor-control circuit before handing over automatic operation. Central Electricity Authority safety regulations

DEV-K1 cyclic timer settings
Use the motor nameplate and observed running current to confirm the application range. Give the installer the existing starter and control information as well. A current-range label describes the device application and the installer still checks the motor-switching equipment and circuit protection.
Choose an initial run period from the water source and the pump maker’s operating limits. Observe whether water delivery remains steady toward the end of a normal run. Ask the installer how much rest the source and motor need, including any limit on starts per hour. Use those observations to agree on the first watched test.
VUKAR’s applicability table lists the run and rest functions on this model. Confirm the displayed label and unit on the installed revision before setting either interval.
Read back the saved run and rest durations with their units. The cycle begins and ends according to the installed operating mode. Watch the pump stop, time the rest from the actual stop, and stay for the next permitted start. That gives you evidence for both intervals. VUKAR timer types guide
If the motor stops before the intended time, note the display and the condition of the source. A protection stop, a stop from another control and a normal timer stop require different checks. Leave the running values in place while the installer investigates the reason for an unexpected stop.

How to use DEV-K1 after installation
At handover, compare what the device shows with what the starter and motor actually do. If a control signal changes and the contactor does not respond as expected, record both observations. The electrician can check the control path before any timer setting is changed.
Before the watched test, confirm that water is available and the receiving point can accept it. Keep the enclosure closed and make sure the normal stop control is safely accessible. Agree on what counts as a successful run before you enable automatic operation.
- Confirm the saved settings. Read the active mode and relevant values with the installer. Record what should permit a start and what should end the run.
- Observe the motor response. Observe how the starter responds to the first ON command and verify the next start only after the recorded rest time.
- Verify recovery behavior. Ask the installer to document what happens after power returns or a protection condition clears. A permitted automatic restart can occur without a new button press.
- Keep a handover record. Record the DEV-K1 label, supply, motor rating, wiring reference and actual test results together.
What to record during commissioning
- Start of run
- Record the active mode, actual start time and whether water reaches the delivery point.
- End of run
- Compare the stop time with the saved interval and record whether delivery remained steady.
- Rest period
- Measure from the actual stop. Record the display and the source condition if it can be checked safely.
- Next permitted start
- Confirm the observed restart matches the saved rest duration and the operating rules for the site.
Observe each transition from a dry and safe location. If the actual response differs, record what the display, starter and pump each did. The installer can then trace whether a setting, an input, a protective condition or the motor circuit determined the outcome. VUKAR manuals and connection diagrams
Trace the start request through the existing starter
Ask the electrician to record where the auto switch enters the starter control circuit and which local controls can stop the motor. With the enclosure closed, observe a normal start and stop. Read the controller state and then verify the motor response. If they disagree, the installer can use the circuit documentation to locate the point that needs checking.
Record the current range and sensing arrangement
Write down the installed device code, the motor nameplate current and the normal running value observed during the test. Have the electrician confirm the current-sensing hardware for that revision and check that the display is consistent with the actual installation. If the motor or starter is changed later, recheck the combination before reusing the earlier settings.
Agree on recovery after an interruption
During handover, ask which states allow another run after a stop or power loss. Keep the approved mode and any waiting period in the record. The operator should know whether to expect a restart when a timer becomes eligible and which control must be used when the equipment needs to stay stopped for service.
Revisit the cycle when delivery changes
A pump can still run for the programmed interval while delivering less water than expected. During each inspection, note how delivery behaves near the end of the run and whether the source is ready at the next start. Review those observations with the installer before extending an interval or increasing the number of starts.
DEV-K1 troubleshooting after an unexpected stop
Read the display and note the elapsed run time, water delivery and the condition that preceded the stop. On applicable VUKAR controllers, FOL indicates overload, FDR indicates dry run, and HIU or LOU indicates high or low voltage. If a fault returns, have the cause diagnosed before another run. VUKAR fault-code guide

How do I decide whether the rest duration is still suitable?
Watch whether water delivery stays steady through the run and whether the source has recovered before the next start. Review the values with the installer when the source conditions or pump change.
When a pump, starter, float or water source changes, give the installer the previous commissioning record. Have them recheck the expected sequence and verify the changed installation before relying on automatic operation again.
Before the system is left on automatic
Review the normal start, normal stop and recovery behavior with the person who uses the pump. Keep the approved settings near the controller or in the site records. Where another control also affects the pump, identify its role and record who should be contacted if the motor responds differently from the documented sequence.
Record an unexpected event while it is fresh
If there is an unexpected stop or a delayed start, write down the time, the visible display and what the pump was doing. Also note any recent power interruption or change to the water source. Keep those details with the equipment model so the installer can check the relevant setting and conditions.
Recommended DEV-K1 Settings: Cyclic Run/Rest and Restart Defaults