VUKAR DEV-H4 Openwell Water-Level Controller: Installation and Clock Timer Settings
Mohit VekariaShare
For a DEV-H4 single phase openwell water level controller setup, set the allowed hours and commission both float inputs on the single-phase openwell or monoblock system. Have a licensed electrical contractor install the equipment and check the protection settings using the instructions for the installed revision.
DEV-H4 installation and equipment match
Identify the pump, its phase, and the starter or motor-control circuit before selecting the controller. Record the motor’s voltage, HP and rated current. Also identify every float supplied for the selected installation and its purpose. The installer should check compatibility of the motor switching and sensor inputs together.
Use the single-phase water-level controller with the compatible motor-control circuit for your installation. Give VUKAR the exact model and motor details when you request instructions. DEV-H4 specifications and options
The controller receives a signal from the tank float and issues a motor command through the compatible control circuit. Have the installer check the sensor wiring, cable route and the motor-switching equipment against the matching guide. Label each float cable before commissioning and record what each input is meant to report.
Have the installer verify protective earthing, isolation and circuit protection. The supply must be isolated and verified off before anyone opens an enclosure or handles conductors. The electrician should verify the single-phase supply and existing motor-control circuit before handing over automatic operation. Central Electricity Authority safety regulations

DEV-H4 clock and cyclic timer settings
Record the source and receiving signals at each schedule boundary. When a start is missed, the operator can compare the active clock window, source condition and tank demand before any wiring or setting is changed.
Set the time and verify the displayed day or date before entering an event. Confirm whether the installed mode uses individual clock events or an allowed operating window. Enter the intended times using the controls documented for the panel revision. Read the saved entries back with the installer and record their day selection.
Confirm the menu label, unit and save sequence in the instructions supplied for the installed unit.
Record cyclic ON and OFF values separately when repeating operation is enabled. Those values describe elapsed run and rest periods. The clock describes the time of day. Ask which rule applies when a run reaches the end of an allowed window, then watch the installation at a planned boundary. VUKAR timer types guide
Check the displayed time and saved schedule after a controlled power-return test if the installer can safely perform one. Record whether the chosen mode continues, waits or requires an operator command. Use the exact revision instructions to understand the result and make it part of the handover.
Confirm how the float signal and clock are used in the selected mode. Watch what happens when the tank calls for water inside the window and when the tank reaches full. Write down how the installed system behaves when the window closes while demand is still present.

How to use DEV-H4 after installation
With the enclosure closed, check the controller’s display and the actual starter response during the first watched fill. Record tank level, float state, motor command and water delivery as separate observations so a later service visit can trace the signal path.
Before the watched test, confirm that water is available and the receiving point can accept it. Keep the enclosure closed and make sure the normal stop control is safely accessible. Agree on what counts as a successful run before you enable automatic operation.
- Confirm the saved settings. Read the active mode and relevant values with the installer. Record what should permit a start and what should end the run.
- Observe the motor response. Verify normal filling and the response to both the full receiving tank and a source condition that prevents pumping.
- Verify recovery behavior. Ask the installer to document what happens after power returns or a protection condition clears. A permitted automatic restart can occur without a new button press.
- Keep a handover record. Record the DEV-H4 label, supply, motor rating, wiring reference and actual test results together.
What to record during commissioning
- Before the window opens
- Record the displayed day, time and motor state. Check whether the selected mode is waiting for an eligible period.
- At an eligible start
- Compare the scheduled time, controller indication and actual pump start. Record any source or tank condition that affects permission.
- At a cyclic stop
- If cyclic control is active, time the actual run and rest periods. Check the display before attributing the stop to the clock.
- As the window ends
- Record the motor state and verify how the next allowed event is shown on the display.
Observe each transition from a dry and safe location. If the actual response differs, record what the display, starter and pump each did. The installer can then trace whether a setting, an input, a protective condition or the motor circuit determined the outcome. VUKAR manuals and connection diagrams
Map each float signal before commissioning
Ask the installer to label the receiving-tank input and any separate source input the model and site use. Check the normal positions and the planned levels while the float can still be inspected. At handover, record both the tank level and the state shown on the device. This helps locate a problem when a cable, float or input changes.
Check what the starter does with a valid tank signal
The tank may send a demand while a protection condition or another control holds the motor off. Check the displayed state, the starter response and the actual water delivery in that order during the first watched fill. Record the observations with the selected mode so the next technician can reproduce the conditions.
Review the site when a sensor or tank changes
After a float is moved or a tank is replaced, check that the sensing point still leaves safe room below the overflow and enough water for the intended use. Have the installer verify both transitions again. Update the handover record with the new levels and the response that was observed during the test.
Keep a record of the active schedule
Write down the date of the test, the intended start and stop times, and the settings that were enabled. Have the operator read back the day selection and the normal display before leaving the site. If the schedule is later revised, keep the earlier values in the service record so the next person can see what changed.
DEV-H4 troubleshooting after an unexpected stop
Read the display and note the elapsed run time, water delivery and the condition that preceded the stop. On applicable VUKAR controllers, FOL indicates overload, FDR indicates dry run, and HIU or LOU indicates high or low voltage. If a fault returns, have the cause diagnosed before another run. VUKAR fault-code guide

Why did the motor stay off at the time entered?
Read the actual clock, day selection, enabled event and operating mode. Ask the installer to check any active tank, source or protection condition if the clock is correct. Record the display before you change a saved event.
When a pump, starter, float or water source changes, give the installer the previous commissioning record. Have them recheck the expected sequence and verify the changed installation before relying on automatic operation again.
Recommended DEV-H4 Settings: Clock Schedule, Tank Levels and Cyclic Timing