DEV-P1 recommended parameter settings hero with a repeating run and rest pattern

Recommended DEV-P1 Settings: Three-Phase Cyclic Run/Rest

Mohit Vekaria

The DEV-P1 recommended parameter settings start with two values. Set RUN for the time the three-phase pump can deliver water steadily, and set RST for the pause the source and motor need before another start. Use the limits for your installed pump and motor. Have your electrician set the protection values and observe one full cycle before leaving the pump on automatic.

What RUN and RST do on the DEV-P1

The DEV-P1 three-phase cyclic auto switch sends run and stop commands to a compatible starter circuit. In cyclic mode, RUN is the planned time the pump is on. RST is the planned pause after a normal timed stop. The pump can start again at the end of that pause when the operating mode and protection conditions permit it. A fault or another control can interrupt the sequence.

The DEV-P1 repeats intervals. A clock timer follows set times of day. If you expect a start at 6:00 am, you need time-of-day scheduling, which VUKAR lists on the DEV-P2. An auto-off timer is for a timed stop after a start. If you expect a repeating cycle, confirm which mode is active before entering the durations. The VUKAR pump timer guide shows where each timer fits.

DEV-P1 run and rest intervals showing 10 minutes on and 20 minutes off in an example cycle
In this example, the next start becomes eligible 30 minutes after the first start.

How to choose DEV-P1 run and rest intervals

Choose RUN from the water you can deliver in one stretch. A borewell may give a steady flow at first and weaken later. Note when that change starts during normal supervised operation, and let the installer assess why. Choose the run duration using the source’s usable output, the pump maker’s duty limits, and the space available at the receiving end. The pump also needs to meet any minimum run time its maker specifies.

Choose RST from the recovery time and the motor’s start limits. A well or sump may need time to refill. The motor can also have a minimum time between starts or a limit on starts per hour or day. Use the applicable instructions for your actual equipment. The Franklin Electric 50 Hz submersible motor manual is one example of a manufacturer specifying start-frequency limits by motor type and rating.

DEV-P1 run and rest intervals illustrated by water delivery, recovery and motor start limits
Use the water source and the pump maker’s limits to choose both durations.

For planning, add RUN and RST to get one ideal cycle in minutes. Divide 60 by that total to estimate the average number of scheduled starts per hour while the cycle repeats. A 10-minute RUN and a 20-minute RST give a 30-minute cycle, or about two scheduled starts an hour. These numbers illustrate the maths. Set the actual values for your site.

Equal pump time can hide very different start counts. A 5-minute run with a 10-minute rest also pumps for about 20 minutes per hour, but it schedules about four starts per hour. It gives the water source only 10 minutes to recover each time. Include extra starts from other controls or power recovery when the installer reviews how often the motor will actually start.

Estimate how much water one run delivers

If the flow stays fairly steady, multiply the flow at the delivery point in litres per minute by the run time in minutes. An observed 25 litres per minute over a 10-minute run gives about 250 litres. That estimate assumes steady delivery throughout the run. If the flow falls as the source level drops, use a measured volume over the full run before depending on the estimate.

Think about where the water goes, too. If you are filling a tank with less than 250 litres of free space, that example run could overflow it. If you are feeding irrigation, a change in the number of open outlets can change the measured flow. Use the conditions you expect during normal operation, and tell the installer if those conditions vary.

DEV-P1 settings to set at first installation

Give the electrician the DEV-P1 model and revision, the motor nameplate, and the starter details. Read the displayed labels and units against the instructions for that revision. The table shows what each value controls and where the starting point comes from. Use the VUKAR manuals page to locate the matching instructions.

Parameter Purpose Unit and starting point
RUN Sets the pump-on duration. Minutes. Use steady flow, pump limits and receiving capacity.
RST Sets the planned pause between runs. Minutes. Use source recovery and motor start limits.
Overload Stops the motor on sustained excess current. Amps (A). The electrician sets the threshold and reviews the delay in seconds.
Dry run Uses low motor current to detect a possible loss of water. Amps (A). The electrician sets the threshold and reviews the delay in seconds.
High and low voltage Define the allowed supply range for operation. Volts (V). Use the motor and controller specifications.

Have the electrician confirm the phase conditions and normal motor operation before allowing automatic starts. If the screen asks for device registration, use the code VUKAR issues for that unit. Keep any existing current-sensor selection, calibration, starting torque time and restart settings at their documented defaults or at the values already set by your installer. Record any installer-approved change beside the old value so it can be traced during service.

DEV-P1 auto switch restart defaults

When the pump sits idle, ask what happened just before it stopped or began waiting. A normal timed stop starts the cyclic rest period. When power returns, the auto-start delay (AST) can affect when operation resumes. A dry-run trip can invoke the fault restart wait (ATC) if the installed configuration allows a retry. If overload lockout is active, have the electrician resolve the cause and use the documented manual reset procedure.

DEV-P1 auto switch restart defaults chart showing separate waits for timed stop, power return and dry-run trip
The event that started the wait tells you which setting to review with the installer.

Power loss may also affect what the timer remembers. Have the installer record how the memory setting (MEM) and overload memory or lockout setting (OLM) behave on your revision. Leave those settings in place until the installer has reviewed the consequences of an automatic restart. The three-phase auto switch comparison lists the available timer and protection features.

Watch one full cycle before handover

Choose a time when the source has water and the receiving point can accept it. Keep the enclosure closed and observe from a safe place. Have the electrician handle wiring, measurements and changes to protection or automatic restart. Follow the Central Electricity Authority electrical safety regulations for installation and service.

  1. Read back the saved values. Write down the active mode, RUN, RST and their units.
  2. Record the actual start and stop. Note when water starts flowing, whether it stays steady, and what the display shows at the stop.
  3. Time the pause from the actual stop. Observe when the next start is permitted and whether the motor starts as expected.
  4. Record any interruption. Note the elapsed time, display indication and source condition. Give those details to the installer before changing a timer value.
DEV-P1 three-phase cyclic auto switch handover record showing start, stop and restart observations
Keep the actual times and display state with your saved settings for future service.

Write the approved values on the handover record with the revision and the date. That gives the next operator a starting point if the settings are lost, the pump is replaced, or water delivery changes after a dry spell. Ask the installer to revisit the timings if the replacement motor has different duty or start limits.

Can RUN stop the pump when the tank is full?

RUN stops the pump when its time expires. DEV-P1 has no built-in tank-level control, so the timer cannot tell how much free space the tank has at the start. If the pump needs to respond to the actual water level, have your installer select a suitable level control and document how it affects the start and stop sequence.

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.