DEV-G4 recommended parameter settings — VUKAR illustrated guide

Recommended DEV-G4 Settings: Clock Windows, Tank Levels and Run/Rest

Mohit Vekaria

For the DEV-G4 recommended parameter settings, commission both float inputs before setting operating hours and RUN/RST. The DEV-G4 joins three-phase openwell or monoblock level control with clock scheduling and cyclic timing.

Start with the installed unit

Write down the model and revision from the unit label, the motor nameplate, the type of starter and the normal operating mode. Keep those details together. Two devices with similar front panels can have different menu options. The correct model guide and the current installation record are the references for any actual setting.

Use the product page to identify available functions and the installed revision’s guide for units, menu names and how the selected mode operates.

Product manuals

If the pump, sensor or operating mode changes, keep the previous record. Mark the date of the change and have the installer observe the revised sequence before relying on automatic operation.

DEV-G4 recommended parameter settings, parameter settings showing Receiving and source inputs, Clock window and active days, RUN/RST
Start with these settings or observations.

Identify both floats in the handover record

Ask the installer to label the receiving-tank input and the source-tank input in the handover notes. The first can tell the controller that the receiving tank needs water. The second reports whether the water source is in the state required for operation. The actual indication and switching logic depend on the installed revision and connection.

Observe the two inputs one at a time with the installer. Start with a low receiving tank and a source known to be ready. Then ask the installer to demonstrate the source-low indication by the documented safe procedure. When the source becomes available again, record whether the pump waits for another condition, such as a rest interval or an operating window, before it starts.

Separate a request from permission to start

A low tank can create a request before a clock window opens. Depending on the selected mode, a start can also depend on the state of the water source, any cyclic rest period and protection. Write each condition in a separate line of the event log. That makes it easier to find the actual reason for a delayed start.

Where the controller offers separate operating windows for water-level and cyclic modes, label each saved window by its purpose. Test inside and outside the relevant window with the installer. Ask them to record how your revision treats a low tank at closing time and what it will do when another window opens.

Set the clock before using a schedule

A clock event uses a time of day, such as 06:00. RUN and RST are elapsed durations, such as 10 minutes. Read the displayed time, weekday and enabled days together. A saved event can show the correct time yet remain inactive because the wrong day or mode is selected. Begin with one event the operator can safely observe.

Watch the opening and closing of the first window and record the actual behavior. If a pump is already running near closing time, use the installed revision’s instructions to determine how that mode handles the boundary. Write down whether it stopped, completed the current run or waited for a later permission. Test the specific sequence before adding overlapping events or leaving it unattended.

Pump timer guide

What to observe on this model

For a three-phase openwell or monoblock pump, use a three-column log. Keep the receiving tank low and compare source ready inside the window, source low inside it, and source ready outside it. Have the installer simulate source-low safely. Record receiving demand, source permission and clock permission separately. This is especially useful when the source refills just before the window closes.

Use one entry for the clock or day and another for elapsed minutes. Record the selected window, any timer pause and the motor response separately. A later start is easier to explain when the log shows which of those conditions changed first.

DEV-G4 recommended parameter settings, settings example showing the sequence to observe
Observe the sequence and record what happens.

Read the real water level and the controller state

Mark the observed low and full switching points with the installer while the sensor is in its normal installed position. Write down the physical water level, the state shown on the controller and when the motor actually starts or stops. If those three observations disagree, keep the evidence and ask the installer to review the level input and the selected mode.

A level sensor can report that the receiving tank needs water. The start can still depend on source conditions, timing and protection. During a supervised test, observe a valid request and the documented full-level stop. If there is a source input, ask the installer to demonstrate its low-water response using the prescribed method while keeping the pump protected.

Choose RUN and RST from the water supply

RUN is the elapsed pump-on time. RST is the planned pause between cyclic runs in the selected mode. Choose RUN based on how long the source can deliver a steady flow, the space available where the water goes, and the motor maker’s permitted operating conditions. For RST, consider how long the source needs to recover and any minimum time between starts for the motor.

To estimate starts per hour during an uninterrupted cycle, add RUN and RST in minutes and divide 60 by the total. For example, 10 minutes on and 20 minutes off gives about two planned starts per hour. These are example values. Include any separate starts from other controls, power recovery or fault recovery when the installer reviews the motor’s actual start frequency.

Motor manufacturer manuals

Use the motor and supply limits

Have the electrician match the motor’s nameplate and the controller’s sensing arrangement before setting overload, dry-run or voltage protection. A setting copied from a different pump can be unsuitable even when the pumps have the same horsepower. Ask the electrician to record the approved values, their units and which manual or measurement they used. Keep the previous approved values in the record if a setting needs to be changed.

Observe normal operation from a dry and safe place with the enclosure closed. Changes to wiring, live measurements, current sensing, protection and automatic restart belong with the installer. If a fault reappears, record the indication and stop using automatic operation until the cause has been assessed. Use the product instructions and the applicable electrical safety rules for installation and service.

Electrical safety regulations

What to record

Water and source Actual tank level or water delivery, and when it changed.
Controller Active mode, saved value or visible indication and its unit.
Starter and motor Actual start and stop, and first permitted restart where applicable.

Make a two-line event record. In the first line write the expected result and the setting that should produce it. In the second line write the actual time, visible indication and observed water delivery. If an observation is missing, leave that field blank and tell the installer.

DEV-G4 recommended parameter settings, settings record for the display, operating state and pump response
Keep the display, mode and motor response together.

Record what happens after an interruption

An automatic restart can have several conditions. If power returns, a permitted start may depend on the mode, restart settings and normal protection conditions. Some configurations also retain earlier timing information. Use the revision guide and ask the installer to explain the behavior for the mode you actually use. Keep the area around the pump and moving parts clear during supervised testing.

If the pump was waiting before an interruption, write down the time of the interruption, the display after power returned and the actual next start if it occurred. Ask the installer to record how a normal cyclic rest differs from a fault recovery wait. Leave restart settings at the approved values until the behavior is understood and tested.

Change one condition between watched tests

Begin a test with the mode and relevant settings written down. Change one approved timing or operating condition at a time with the installer. Then observe the pump from the start permission through the actual stop. If two settings change together, a normal or unexpected result is harder to explain later.

Use one record for the expected result and one for what really happened. For a clock event include the active day and time. For a level event include the physical water level and display. For a cyclic stop include actual elapsed minutes. When an event repeats, compare those records before requesting another setting change.

Keep a record another operator can use

Write the model and revision, the motor details, the saved mode and the approved values at the top of the record. Under that, note actual start and stop times, any physical tank level or source condition, the display at the time and the result of the test. If the installed setup uses automatic restart, include the first permitted restart and what triggered it.

DEV-G4 recommended parameter settings, settings handover checklist for recording the test
Use this record for the first supervised test.

Model guide and support

Model or family reference · VUKAR Technical Support

Keep the model label, visible display and motor nameplate ready.

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.