DEV-K4 recommended parameter settings cover for weekday schedule and run/rest.

Recommended DEV-K4 Settings: Clock, Weekday Schedule and Run/Rest

Mohit Vekaria
DEV-K4 recommended parameter settings cover for weekday schedule and run/rest.

DEV-K4 recommended parameter settings are a commissioning record for your exact single-phase digital auto switch and compatible starter circuit. Read back the controller clock, enabled weekdays and active window, then record the approved run/rest minutes and protection settings for the connected starter. Confirm the first scheduled operation with the installer.

DEV-K4 recommended parameter settings checklist for installation and commissioned defaults.
Record installation settings separately from the values already commissioned.

What belongs on the first-installation checklist?

A DEV-K4 is commissioned for a compatible heavy-duty single-phase starter circuit. The user wants automatic operation only during agreed weekday hours. Keep a record of the allowed schedule and how the selected cyclic operation behaves within it.

Write the panel model and variant as they appear on the label. Add the controller revision and the motor’s rated current and voltage from the nameplate or pump paperwork. The model tells you which functions the panel offers. The actual motor, supply, water source and operating mode determine the settings that belong in the record. Use the revision-matched instructions for the menu labels and save procedure. VUKAR product manuals and parameter reference

Setting What it does What to record
OL / OLT Overload current threshold and delay before an overload trip. Approved amps (A) and seconds (s).
DR / DRT Low-current threshold for dry-run detection and its own trip delay. Approved amps and seconds.
HIU / LOU High and low supply-voltage limits. Both limits in volts (V).
RUN / RST Run and rest lengths for the commissioned repeating cycle. Both durations in minutes and the exact labels shown.
Clock and enabled schedule Current controller time and days or slots used by the selected schedule. Clock and day, enabled weekdays and operating period.

Read current limits and delays as pairs

OL and DR are current limits. OLT and DRT are delays. With overload protection, the controller looks for current above the approved overload limit for the associated time. With dry-run protection, it looks for current below its approved threshold for the corresponding time. A short change in the current reading and a continuing condition tell the controller different things. Record the limit and delay together so the next installer can see both parts of the decision.

DEV-K4 recommended parameter settings showing overload and dry-run current limits with their delays.
Use amps for OL and DR and seconds for OLT and DRT.

Keep the two voltage limits in the same record, with HIU for the upper limit and LOU for the lower limit. A voltage shown on the front display is the reading at that moment. Write a measured reading and a saved limit in different fields. If a protection trip repeats, note the displayed indication and the conditions around the stop so an installer can investigate the motor, supply or water source.

Have a qualified installer choose protection values using the actual motor and supply. Values from a different pump or controller revision can mislead even when the model name looks familiar. Ask the installer to record who approved the final limits and the date they were set. For wiring and work inside the enclosure, use a licensed electrical contractor and have the supply isolated and verified dead. Central Electricity Authority safety regulations

VUKAR DEV-K4 single-phase digital auto switch

VUKAR product

DEV-K4 Single-Phase Digital Auto Switch

For compatible pump starter circuits. See the product gallery and model features for weekday schedule and run/rest.

View DEV-K4

Weekday schedule and run/rest

DEV-K4 is specified for compatible 5–200 A pump-motor applications. Record the actual motor and sensing details separately from that product range. Save the active weekday selections, keep unused slots inactive where supported, and label which run/rest pair was tested.

Record RUN and RST using the exact labels shown on your installed controller. In a commissioned repeating cycle, record both run and rest in minutes. Observe a complete run, the normal stop, the rest period and the next permitted start. Use the pump maker’s operating limits and the installer’s observations of water delivery when choosing the cycle. If another mode uses a time differently, record that mode separately.

Set the controller’s current time and applicable day or date before reading the enabled schedule. Record the weekday selection, the active window and what the installed mode did during the first watched period. The controller clock tells you when a time window applies. The elapsed timers tell you how long the pump ran or rested. Keep unused slots inactive where the revision supports it.

DEV-K4 recommended parameter settings test checkpoints for weekday schedule and run/rest.
Check the current weekday separately from the elapsed run and rest settings.

Keep the other applicable values as commissioned

Keep the documented defaults for the exact controller revision or the values the installer already commissioned. If TRQ appears on your panel, leave its starting torque time at that approved value. Keep current-sensor selection, marked CTS where applicable, and current or voltage calibration as commissioned. Those values belong with the installed hardware and measurements. Have the installer review changes using the matching instructions.

The approved restart settings may include a fault delay, memory after an outage or lockout behavior. Ask the installer to write down which options apply and what can happen after a supply interruption or fault. Keep the recorded mode and labels with the values so they still make sense at the next service visit.

Write down what happened during the watched run

If one weekday works and the next does not, compare the stored weekday selection and the displayed clock before assuming the run/rest pair changed. Add any fault indication and whether the supply was present.

DEV-K4 recommended parameter settings handover record with model, saved values and watched test.
Keep this information with the pump and panel paperwork.

Keep three things together for handover. First, identify the panel variant, revision, motor and water source. Second, copy the saved settings and units, including the mode that was tested. Third, write when the test started and stopped, what the display showed and any unexpected event. Date the record and add the installer’s name. This gives you a baseline if a motor, sensor or water source changes later.

If the values already in the panel and the settings on an old service sheet differ, keep both records until the installer has identified the current approved set. A note such as “read from panel” or “approved after test” tells you which numbers were observed and which ones were accepted for the installation. Leave a missing unit or value blank until it can be confirmed.

When reporting a problem, send the panel model and revision, motor rating, current mode, display code and the time of the event. Include the saved timer or protection setting that relates to the event and note any recent change in the installation. VUKAR technical support

Review the record again after the pump has worked under its usual conditions. Note any difference between the first test and later operation, including a change in flow, demand or the supply. Keep that observation as a separate dated entry. If an installer changes a setting, keep the reason for the change and the result of the next supervised run with the new record.

If you inherit the installation, identify the existing panel and pump before relying on a note left by the last owner. Find out whether the equipment was serviced or replaced after the note was written. Ask the installer to review the existing record alongside the installed hardware and to explain any change before accepting a new setting.

For a repeating cycle, record the first normal stop and the next permitted start on separate lines. If the source, supply or mode changed in between, write that alongside the elapsed time so the observations can be compared with the approved cycle. Keep the front display photo with the dated notes. Record the panel revision and the test mode next to the photo, because a display code or menu label is easiest to interpret with that information. If the display changes during the test, add when it changed and whether the pump continued to deliver water.

Use the DEV-K4 installation and setup guide for the panel-specific setup sequence and the VUKAR guide to pump timer types for how the different timing modes behave. At the end of the visit, keep the approved settings sheet where the next owner or technician can find it.

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.