If you need a Digital Auto Switch Supplier in Rudrapur, compare VUKAR DEV-P1 for a compatible three-phase pump starter that already works. First count how many times the pump would start in an hour. Two timer settings can give the same total run time and still start the motor a different number of times. This matters when a plant moves small amounts of stored utility water throughout a shift.
Which Pantnagar utility-water pump will the switch control?
The Udham Singh Nagar district industry page lists the Pantnagar industrial estate. The Central Ground Water Board's publication entry lists Rudrapur among the district blocks in its aquifer mapping catalogue. An aquifer is a layer of ground that holds water. On a site with a borewell and a storage tank, name both the borewell pump and the pump that moves stored water. This example is for the second pump. It assumes the stored water suits the utility job.
Ask the operator who uses the water and how long they can wait between transfers. A wash point that draws from a small tank may use its water before the next cycle. A tank with more usable storage may be able to wait. Mark the lowest level needed at the receiving point and any separate stop rule. Give that drawing to the electrician. The pump timer and a tank-level stop are different controls.

How a three-phase cyclic timer works
A cyclic timer repeats an on period and an off period. The VUKAR DEV-P1 product page lists cyclic timing and motor protection for compatible three-phase pump applications. It works with a suitable starter. Identify the starter and the existing control voltage before ordering. If a pump has to start at a set time of day, compare a clock timer. If a float must stop the pump, have the installer confirm how the existing level control will still stop it.
Worked example · Same run time, different starts
Two minutes on plus eight minutes off gives six starts per hour and moves 20 litres per run. Four on plus 16 off gives three starts per hour and moves 40 litres per run. Both settings move 120 litres in the hour at a steady flow of 10 litres per minute. These are example values.
| Choice | What changes |
|---|---|
| 2 min on, 8 min off | 6 starts per hour, 20 L per run |
| 4 min on, 16 min off | 3 starts per hour, 40 L per run |
| Tank becomes full before time is up | Test that the level stop takes priority |
Choose the run and rest periods together. A longer rest lowers the number of starts, but a small receiving tank may empty before the next run. A longer run can move more water in one go, so the tank needs more space or a level stop that acts first. Ask for the motor and starter makers’ limits. There is no single safe number of starts per hour for every pump.
Compare pump starts per hour before ordering
The worked example uses a steady flow of 10 litres per minute. At each start, the receiving tank has room to accept the water. Divide 60 by the full run-and-rest time in minutes to estimate starts per hour in a steady sequence. The result is a planning number. During a test, count the real starts because a level stop, power cut or operator stop can change the pattern.
What to check for an existing pump starter retrofit
Send the motor plate, starter label, control voltage, intended run and rest times and the two tank levels that should allow or stop transfer. Ask the electrician to show what happens when the source is low, the receiving tank is full and the power returns midway through a cycle. Record the agreed restart behaviour, the parts being added and which old protections stay. Request the exact model and dispatch estimate for your delivery PIN code. Ask the operator to record the tank level at the end of the longest pause. If the level falls below the working mark, change the plan before changing the hardware.
Use the three-phase digital auto switch comparison, then send VUKAR the starter and cycle details. Keep the worked calculation on the quote so the installer can test the same job.