Automatic Water Level Controller Supplier in Pithampur

Mohit Vekaria

If you need an Automatic Water Level Controller Supplier in Pithampur, SubmersibleShop.com offers VUKAR DEV-G2 for compatible three-phase openwell and monoblock pumps. It can suit a clean utility-water transfer when the site needs two tank signals. If some stored water must remain after a routine transfer, agree on the source stop level with the site engineer before ordering.

Define a clean utility water reserve before drawing the controls

A Pithampur industrial water-supply project tender separates the treatment, clean-water storage and distribution stages. Reporting on an MPIDC storage proposal also describes storage intended to cover disruptions in the estate. Those records refer to the wider supply system. At your unit, start with the water in your own tank. Write down how much the next shift needs to keep for agreed utility work and how much the transfer pump can move today.

Use the tank drawing or a measured level-to-volume chart. One centimetre of depth may hold a different amount at different points in a tank with sloping or curved sides. Ask the site engineer to convert the agreed reserve volume to an actual stop level. Also allow for water that the pump cannot use at the bottom. Tell the supplier whether the number on the work order means total water held or water the pump can draw.

Example of 1,500 litres of usable source water divided between normal transfer and a reserve
The example shows 1,000 litres for normal transfer and 500 litres held back. The site engineer must convert the agreed reserve to an actual tank level.

Set the purpose of the source low float stop

A float is a switch that moves with the water. The VUKAR DEV-G2 listing shows two float switches and cyclic timing for compatible three-phase openwell or monoblock pumps. In a typical transfer one signal stops the pump when the source reaches its limit. The other stops it when the receiving tank is full. The installer must confirm the switch position and behavior for your exact tanks and starter. The controller does not measure litres by itself.

Worked example · Leave 500 litres in reserve

Suppose the source holds 1,500 litres that the pump can draw and the site wants to retain 500 litres. A normal transfer can move at most 1,000 litres before the source stop, or less if the receiving tank fills first. Ask for both cases in the test.

Condition Requested behavior
Receiving tank full first Stop the transfer with the receiving float
Source reaches the agreed reserve Stop routine transfer even if the receiving tank needs water
Reserve needs separate access or alarm Ask for a design that specifies the added signals

If the reserve needs a separate release button, an alarm at a second level or more than two independent signals, put that on the quote. Ask the site engineer to design those functions around the pump. Keep the everyday transfer and the decision to release the reserve separate. The operator should know who can approve a change and how that change will be recorded.

Test the three-phase two-tank transfer with both stops

Give the installer the motor label, starter model and a drawing showing both tanks, their pipes and both cable routes. Have the installer show a run that stops at the source limit while the receiving tank is still low. Then test the receiving tank stop with enough water in the source. Put the resulting levels on the handover record. That gives the next shift a way to see why the pump stopped.

What goes in a Pithampur controller quote?

Include the agreed reserve, the measured levels, the two tank locations and the delivery PIN code. Ask for separate lines for the controller and floats, cable, fitting and tests. Ask who will check the settings if the tank or pump changes. Label the source and receiving tanks on the drawing so the same words are used in the quote, the test sheet and the operator's log.

Open the three-phase level controller comparison, then send the tank drawing and reserve requirement to VUKAR to compare the exact model and installation scope.