VUKAR OPA-B Openwell Starter Panel: Installation and Water-Level Settings
Mohit VekariaShare
For a OPA-B openwell starter panel setup, match the single-phase pump and panel variant first. Set up the supplied float so the OPA-B starts and stops the openwell pump at the intended tank levels. Test that sequence before configuring repeating cycles. Have a licensed electrical contractor install the panel and use the wiring diagram for the installed model and revision.
OPA-B installation and motor match
Find the motor nameplate or the paperwork for the pump. Record the phase, rated voltage, horsepower (HP) and rated current in amps. Check the OPA-B panel label and share both sets of details with the installer. The product listing shows these options: 0.5 HP, 0.75 HP, 1 HP, 1.5 HP, 2 HP and 3 HP. Have the installer confirm the exact variant and its suitability for the motor and operating duty. See OPA-B specifications and variants
Keep the panel in a position where the operator can read the display from a dry area. If the openwell installation already has controls, have the installer identify which equipment will issue the start and stop signals and where isolation is provided. An accessible, labelled isolation point helps the next person service the pump safely.
Ask the installer to verify protective earthing, the supply and motor connections, and the circuit protection for the installation. Where the motor needs capacitors, the installer should confirm the type, rating and connections from the motor and panel documentation. The supply must be isolated and verified off before the enclosure is opened for wiring or service. Central Electricity Authority safety regulations

OPA-B water-level settings and operating mode
Set and verify the tank switching points
Confirm which float state calls for water and which state ends filling in the approved mode. Have the installer position and connect the supplied float using the model instructions. It needs enough free movement to change state at the planned water levels. Keep the full-level point below the overflow and check that the installation leaves room for the float to move when the tank fills.
Identify the active settings in the product instructions before entering or changing values.
Check the display and pump response together. Read the indicated level, observe whether the motor receives a start or stop command, and check what the water is doing. A float-driven stop is verified when the float reaches the intended point and the motor stops as designed. A timer can end a run earlier in a configured mode, so record what actually caused the stop. Tank filling and level control
Write down the lower and upper switching points and the active mode. If the panel also uses cyclic timing in this application, confirm the run and rest intervals with the installer after the tank test. Ask which conditions are required for the next start.

Check any recovery delay separately
One OPA-B reference labels the rest setting OFT. The notes describe a waiting period after a dry-run stop while the tank still needs water. Confirm how the installed controller handles that wait and when a restart is permitted. Record any dry-run indication and ask the installer to check water availability before changing a recovery setting.
What matters at this site
Check the openwell and the receiving tank separately. The receiving-tank float reports demand there. The installer still needs to check that the source can supply the motor during a normal run.
Check the water around the pump at the source as well as the water level in the tank it fills. Seasonal changes at the openwell can alter the conditions under which the pump runs. Follow the pump maker’s instructions for the permitted water level and operating limits. Test under normal source conditions and watch that water delivery stays stable.
How to use OPA-B after installation
Ask the installer to explain the conditions required before starting the pump. Check that the receiving tank or delivery point can accept water, that the source can supply the pump, and that you can use the normal stop control from a dry area. Keep the panel closed during the watched test.
- Confirm the mode and saved settings. Read the active setting and its unit with the installer. Agree on what should make the motor start and what should make it stop in this mode.
- Watch a normal start and stop. Observe tank demand, stable water delivery and the upper-level stop as one sequence. Write down the level and display state at each transition.
- Ask about automatic restart. Confirm what the selected mode does when power returns, a timer becomes eligible, or a protection condition clears. Have the installer explain how to leave the equipment safely isolated for service.
- Record the observed result. Write down the motor rating, panel variant, selected mode, settings, display readings and actual stop or restart behavior. Keep the date and the correct diagram in the same record.
The installer should show the operator how to read the display and stop the pump safely. If the observed behavior differs from the planned sequence, keep the pump under supervision while the installer checks which setting or signal controls the motor. VUKAR manuals and diagrams
What to record during the first test
- Tank calls for water
- Write down the tank level, float indication, motor state, and whether water delivery begins.
- Tank reaches its stop level
- Check the exact point where the float changes, the display state, and the motor response.
- Source conditions change
- Record any loss of delivery and the fault or wait indication before checking the next permitted start.
- Water level drops again
- Observe when the controller accepts a new demand and check which operating rule applies at that point.
Repeat the check after the tank has fallen enough to make a new call for water. This second transition helps confirm that the float can move freely in both directions. Keep the installer nearby if the float reads correctly but the motor response differs. They can check the selected mode and any active timing rule while you record what the panel actually did.
If the OPA-B pump stops or fails to start
If the tank calls for water but little reaches it, record whether the motor runs and whether a dry-run indication appears. Have the water path and source checked before adjusting the timer.
Write down the exact display code and what the pump did just before it appeared. VUKAR uses FOL for overload, FDR for dry run, HIU for high voltage and LOU for low voltage. If the same fault returns, ask the installer to diagnose the cause before operating again. VUKAR fault-code guide

If the openwell pump starts and the receiving tank fills slowly, record the source level and whether delivery falls as the run continues. The motor-on indication confirms a command or operating state at the starter. Actual water delivery also needs to be observed.
What should happen when the tank reaches the intended full level?
In the commissioned level-control mode, the float should signal the full level and the motor should stop. Verify the actual level and display during a watched fill, with the normal stop control accessible.
What should the operator record at handover?
Keep the panel label, pump nameplate details, correct wiring reference and observed results together. Record the active mode and tank float, switching levels and cyclic operation. Add any conditions the installer checked, such as the normal display at startup and the expected behavior after power returns. When something changes later, this gives the technician the settings and conditions from a known working run.
Recommended OPA-B Settings: Openwell Tank-Level Control and Run/Rest