TPM-H product videos
VUKAR TPM-H is a 3 phase DOL starter panel with an auto switch, built-in MCB and cyclic timer for pumps up to 10 HP. Its motor protection includes dry-run, overload, voltage and phase safeguards.
TPM-H hardware overview
English captions · 14 seconds · No spoken audio
Read the video text
TPM-H: front panel. Auto switch, cyclic timer and MCB.
TPM-H: panel display and controls. Use the supplied model guide for the selected panel and motor.
Match the motor rating and supply. Use the model wiring guide and a qualified electrician.
Before choosing TPM-H
TPM-H is configured for borewell, openwell and monoblock pumps up to 10 HP. Select the product variant that matches the motor HP.
Questions before choosing
Which pump installation is TPM-H a good fit for?
TPM-H is designed for a compatible three phase borewell, openwell or monoblock installation and combines cyclic timing, an auto switch and an inbuilt MCB with motor protection. This makes its function package easy to match to the way you want the pump to operate. Start with the pump type and supply, then select the motor-rating option from the product details.
How do I select the right TPM-H motor-rating option?
The listed TPM-H range is up to 10 HP, with the individual option selected for the motor nameplate. Matching HP, operating current and the three phase supply gives the installer the right basis for wiring and protection setup. Use your motor details alongside the product options when choosing the variant.
How can I use TPM-H for repeated pump runs?
TPM-H’s Cyclic Timer repeats configured ON and OFF periods. This gives a repeating run/rest pattern for the borewell, openwell or monoblock pumping plan. Choose the intervals for the motor and actual water-source conditions, then configure them using the timer guidance.
How does TPM-H’s power-on delay fit into the timer setup?
TPM-H’s power-on start delay provides a configured wait before starting after supply returns. The run or cyclic settings then determine the subsequent timed operation. Set the start delay and operating pattern separately for the connected pump, with electrical protection configured for the supply conditions.
What does the inbuilt MCB add to TPM-H?
TPM-H includes an inbuilt MCB for short-circuit protection of the panel circuit. This complements the configured overload, dry-run and voltage functions in its motor-protection package. Have the electrician check the breaker, wiring and motor settings together as part of the complete installation.
When is TPM-H the right choice for timed pumping?
TPM-H is suited to time-based pump operation where tank level is managed separately. Its timer provides the selected operating pattern, while the receiving tank remains a separate part of the pumping plan. If you want the pump to respond automatically to tank demand, compare the corresponding water-level-control options.
How is TPM-H’s motor protection tailored to my pump?
TPM-H uses configured overload, dry-run and voltage limits for the connected motor. Matching those values to the nameplate, supply and observed operation makes protection setup specific to your installation. Have a qualified electrician set and check the values using the exact model instructions.
How can I use TPM-H’s saved running hours for maintenance?
TPM-H’s total running hours remain saved across days and power cuts. Recording the reading at service visits lets you calculate operating hours between valid readings for the same motor and counter. Keep the model, date and work done in the service record, and use the pump manufacturer’s maintenance guidance when planning the next visit.
How do I choose between TPM-H and TPM-T?
TPM-H offers cyclic timing, an auto switch and an inbuilt MCB, while TPM-T offers clock and cyclic timing with an auto switch. Compare those functions with the timed-operation, tank-filling or MCB requirement at your site. Open the related model details and match the pump application, supply and motor variant before making the choice.
What makes a good TPM-H installation and handover?
Have a qualified electrician match the three phase supply, motor rating and model wiring to the selected TPM-H variant. Set and test the timed operating pattern for the actual pump and water source. Keep the supplied diagram and agreed settings with the panel so future operation and service start from the correct model information.