Generator load screening
Generator Running & Starting Load Planner
Compare continuous running demand with the largest expected starting event and estimate an apparent-power planning range using entered nameplate values.
Your result
Enter measured or nameplate values to calculate.
- Continuous load
- —
- Starting event
- —
- Planning requirement
- —
- Entered-rate fuel use
- —
- Fuel cost
- —
Method
Continuous watts are summed. Starting demand uses other running loads plus the largest motor starting watts. The higher demand is converted with entered power factor and reserve.
Important limits
Screening only. Use exact manufacturer starting data and generator transient-performance software. Phase, voltage, harmonics, altitude, temperature and load sequencing matter.