Independent transformer screening tool

Existing Transformer Load & Expansion Headroom Screener

Document one simultaneous load reading, add planned load and screen arithmetic headroom. This does not select a transformer.

Step 1

Enter nameplate and field evidence

kVA
V
A

A spot reading is not claimed to be peak demand. Record when and how it was taken.

Planned expansion

kVA
%

Without an entered policy, a within-nameplate result remains Caution—not Pass.

Step 2

Screening result

Enter transformer, measurement and expansion details to screen headroom.

How the screening works

Single-phase current uses kVA × 1000 ÷ V. Three-phase current uses kVA × 1000 ÷ (√3 × line-to-line V). Planned kW is converted to kVA using the entered power factor. No diversity factor is assumed.

Critical limits

Arithmetic screening only—not final transformer selection. It does not determine conductors, breakers, relays or protection settings. Motor starting, harmonics, temperature, altitude, duty cycle and future growth require qualified review.