Heavy-Duty Single Phase Digital Auto Switch, 5–200A – DEV-K4
Heavy-Duty Single Phase Digital Auto Switch, 5–200A – DEV-K4
Couldn't load pickup availability
VUKAR DEV-K4 is a heavy-duty single phase digital auto switch for 5–200A pump-motor applications. It combines clock and cyclic timers with dry-run, overload and voltage protection.
VUKAR DEV-K4 comes from pump control manufacturer Vukar Automation in Rajkot. For DEV-K4 bulk orders, send the quantity you need.
Product and Installation Videos
Monitoring and motor protection

High-Brightness Dual Digital Display
Shows voltage, current and other pump parameters for quick checks during operation.

Fault Display Indication
Displays common motor fault indications to support faster troubleshooting.

Motor Fault Counter
Logs the number of motor faults so recurring issues can be identified.

Motor Total Run-Time Counter
Records cumulative motor running hours to support maintenance planning.

Motor-On and Fault Indication
Provides clear visual indication of motor-running and fault status.

Digital Clock Display
Shows clock and schedule information used for timed pump operation.

Overvoltage and Undervoltage Protection
Stops the pump when supply voltage moves outside the configured safe range.

Overload and Dry-Run Protection
Stops the motor during overload or dry-run conditions to reduce damage risk.

Overload Safety Lockout
Keeps the system stopped after an overload until a manual reset is completed.
Timers and automatic operation

Auto-Off Stop Timer
Stops the pump automatically after the configured running duration.

Power-On Auto-Start Timer
Adds a configurable delay before pump start when power returns.

Built-In Auto Switch
Supports automatic pump start when healthy single-phase power is available.

Cyclic Timer
Runs repeated ON/OFF cycles according to the configured schedule.

Clock Timer
Supports time-of-day pump scheduling through the clock timer.

Auto-Adjustable Starting-Torque Timer
Controls the motor-starting sequence through an adjustable starting-torque timer.

Programmable Auto-Restart Dry-Run Timer
Stops the pump on dry run and retries after the configured recovery delay.

Timer Power-Failure Recovery
Restores the programmed timer cycle after a power interruption.
Registration and advanced timer controls

Digital Product Registration
Supports digital product registration for product and service records.

Total Daily Run-Time Control
Limits or tracks the pump's total daily operating time according to the programmed setting.

Cyclic-Timer Operating Hours
Allows the cyclic timer's daily operating window to be configured.

Multi-Event Real-Time Scheduler
Supports up to 20 programmed start and stop events.
Hierarchical Timer
Supports individually configured cycles within a broader operating schedule.
Installation and support

Protective Enclosure

Technical Support
Technical support is available by WhatsApp and call at +91 63588 96254.
Installation Fit
Select the DEV-K4 current setting for the connected motor and have a qualified electrician complete the wiring according to the supplied product wiring guide.
Before Ordering
Before ordering, match the controller current range to your pump motor nameplate. Have a qualified electrician check the wiring and protection settings against the supplied guide. For current shipping, replacement/return and warranty-eligibility information, review the Shipping Policy, Refund Policy and Contact page.
Compare Before Buying
More VUKAR comparisons
Share
Customers are saying

Hello it's working perfectly every day it start by 0600 hrs and stops at 0709 hrs
Motor Starter Panel & Protection Devices
View all-
Single Phase Borewell Level Control Panels (BOA) કલેક્શન
અહીં Single Phase Borewell Level Control Panels (BOA)ના options compare કરો. પસંદ...
-
Three Phase Digital Auto Switch for Water Pumps કલેક્શન
અહીં Three Phase Digital Auto Switch for Water Pumpsના options compare કરો....
-
VUKARના બધા Products
એક listingમાં સંપૂર્ણ VUKAR catalogue જુઓ: starter panels, auto switches, water level...
-
Three Phase Borewell DOL Panels with Timer (TPM) કલેક્શન
અહીં Three Phase Borewell DOL Panels with Timer (TPM)ના options compare કરો....
Blog posts
View all-
TPM-W ટાંકીનું level display ખોટું? Float indic...
Mohit VekariaTPM-Wનું tank level display ખોટું લાગે તો ખરેખરનું level, float indicator અને pumpનો RUN કે rest લખો.
TPM-W ટાંકીનું level display ખોટું? Float indic...
Mohit VekariaTPM-Wનું tank level display ખોટું લાગે તો ખરેખરનું level, float indicator અને pumpનો RUN કે rest લખો.
-
TPM-V ટાંકીનું level display ખોટું? Float indic...
Mohit VekariaTPM-V પર tank level display ખોટું લાગે તો ખરેખરનું પાણીનું level અને indicator એક જ સમયે લખો.
TPM-V ટાંકીનું level display ખોટું? Float indic...
Mohit VekariaTPM-V પર tank level display ખોટું લાગે તો ખરેખરનું પાણીનું level અને indicator એક જ સમયે લખો.
-
TPM-T daily run time વહેલો અટકે છે? વીજળી ગયા પ...
Mohit VekariaTPM-Tમાં daily run time વહેલો અટકતો લાગે તો મોટર ખરેખર ચાલી એ મિનિટ અને વીજળી પાછી આવી એ સમય લખો.
TPM-T daily run time વહેલો અટકે છે? વીજળી ગયા પ...
Mohit VekariaTPM-Tમાં daily run time વહેલો અટકતો લાગે તો મોટર ખરેખર ચાલી એ મિનિટ અને વીજળી પાછી આવી એ સમય લખો.
-
TPM-H three-phase pump વારંવાર trip? Cyclic sto...
Mohit VekariaTPM-Hનો three-phase pump વારંવાર trip થતો લાગે તો મોટર અટકી, overload indication દેખાયું કે built-in MCBની સ્થિતિ બદલાઈ એ નોંધો.
TPM-H three-phase pump વારંવાર trip? Cyclic sto...
Mohit VekariaTPM-Hનો three-phase pump વારંવાર trip થતો લાગે તો મોટર અટકી, overload indication દેખાયું કે built-in MCBની સ્થિતિ બદલાઈ એ નોંધો.
Blog posts
View all-
WhatsApp દ્વારા VUKAR વોરંટી રજિસ્ટ્રેશન
ડિજિટલ મીટરમાં WRT સુધી જાઓ. 3 અંકનો કોડ અથવા ફોટો WhatsApp પર મોકલો. પાસવર્ડ નાખીને ડિવાઇસ ફરી ચાલુ કરો.
WhatsApp દ્વારા VUKAR વોરંટી રજિસ્ટ્રેશન
ડિજિટલ મીટરમાં WRT સુધી જાઓ. 3 અંકનો કોડ અથવા ફોટો WhatsApp પર મોકલો. પાસવર્ડ નાખીને ડિવાઇસ ફરી ચાલુ કરો.
-
Relay કેવી રીતે કામ કરે છે: Interactive Pump St...
Interactive relay walkthroughમાં pump start requestનો માર્ગ જુઓ અને ચાર સામાન્ય faults control sequence ક્યાં અટકાવે તે સમજો.
Relay કેવી રીતે કામ કરે છે: Interactive Pump St...
Interactive relay walkthroughમાં pump start requestનો માર્ગ જુઓ અને ચાર સામાન્ય faults control sequence ક્યાં અટકાવે તે સમજો.
-
Megger Test: હેતુ, પ્રક્રિયા અને Insulation Res...
Motor insulation resistance સમજો, ઘટતી megohm reading શું બતાવી શકે અને test reportમાં કઈ માહિતી માગવી તે જાણો.
Megger Test: હેતુ, પ્રક્રિયા અને Insulation Res...
Motor insulation resistance સમજો, ઘટતી megohm reading શું બતાવી શકે અને test reportમાં કઈ માહિતી માગવી તે જાણો.
-
RCBO Full Form: કામ કરવાની રીત અને RCCBથી તફાવત
RCBO શું સુરક્ષિત કરે છે, તેના markings કેવી રીતે વાંચવા અને RCCB તથા અલગ MCBs સાથે તેની તુલના જુઓ.
RCBO Full Form: કામ કરવાની રીત અને RCCBથી તફાવત
RCBO શું સુરક્ષિત કરે છે, તેના markings કેવી રીતે વાંચવા અને RCCB તથા અલગ MCBs સાથે તેની તુલના જુઓ.