DEV-P2 3 Phase Auto Switch with Clock & Cyclic Timers
DEV-P2 3 Phase Auto Switch with Clock & Cyclic Timers
Couldn't load pickup availability
VUKAR DEV-P2 is a three phase digital auto switch with clock and cyclic timers for pump automation, monitoring and motor protection.
VUKAR DEV-P2 comes from pump control manufacturer Vukar Automation in Rajkot. Share your motor details when asking about DEV-P2.
Who Should Choose This Model
Choose DEV-P2 when a three phase pump needs both time-of-day scheduling and repeated ON/OFF cycles.
Product and Installation Videos
Monitoring and motor protection

High-Brightness Dual Digital Display
Shows three phase voltage, current and other pump parameters during operation.

Fault Display Indication
Shows common motor-fault indications to support troubleshooting.

Motor Fault Counter
Records the number of detected motor faults so recurring conditions can be reviewed.

Motor Run-Time Counter
Records cumulative motor running time for maintenance planning.

Motor-On and Fault Indication
Provides visual indication of motor-running and fault status.

Digital Clock Display
Shows the clock and schedule information used for timed operation.

Overvoltage and Undervoltage Protection
Stops the pump when supply voltage moves outside the configured range.

Overload and Dry-Run Protection
Stops the motor during detected overload or dry-run conditions to reduce damage risk.

Phase-Loss and Phase-Sequence Protection
Checks phase availability and sequence before three phase pump operation.

Overload Safety Lockout
Keeps the controller stopped after an overload until a manual reset is completed.
Timers and automatic operation

Auto-Off Stop Timer
Stops the pump after the configured running duration.

Power-On Auto-Start Timer
Adds a configurable delay before pump start after power returns.

Built-In Auto Switch
Supports automatic pump start when the required supply conditions are available.

Cyclic Timer
Runs repeated ON/OFF cycles according to the configured schedule.

Clock Timer
Supports time-of-day pump scheduling through the clock timer.

Programmable Dry-Run Restart Timer
Stops the pump on dry run and retries after the configured recovery delay.

Timer Power-Failure Recovery
Restores the programmed timer cycle after a power interruption.
Registration and advanced timer controls

Digital Product Registration
Supports digital registration for product and service records.

Total Daily Run-Time Control
Controls the pump's total daily operating time according to the programmed setting.

Cyclic-Timer Operating Hours
Allows the cyclic timer's daily operating window to be configured.

Multi-Event Real-Time Scheduler
Supports up to 20 programmed start and stop events.
Hierarchical Timer
Supports individually configured cycles within a broader operating schedule.
Installation and support

Protective Enclosure

Technical Support
Technical support is available by WhatsApp and call at +91 63588 96254.
Selection and Installation
Use with a compatible three phase pump starter circuit. Verify motor rating, phase sequence, clock settings and wiring before commissioning.
Before Ordering
Before ordering, confirm your pump motor rating and existing three-phase starter wiring. Have a qualified electrician check phase sequence and protection settings against the supplied guide. Review the current Shipping Policy, Refund Policy and Contact page.
FAQ
Which application is DEV-P2 for?
Choose DEV-P2 when a three phase pump needs both time-of-day scheduling and repeated ON/OFF cycles.
Does it include a clock timer?
Yes. This model includes both clock and cyclic timers.
Compare Related Models
More VUKAR comparisons
Product videos and selection guidance: Digital Auto Switch Videos.
Share
Customers are saying

Motor Starter Panel & Protection Devices
View all-
Single Phase Borewell Level Control Panels (BOA) કલેક્શન
અહીં Single Phase Borewell Level Control Panels (BOA)ના options compare કરો. પસંદ...
-
Three Phase Digital Auto Switch for Water Pumps કલેક્શન
અહીં Three Phase Digital Auto Switch for Water Pumpsના options compare કરો....
-
VUKARના બધા Products
એક listingમાં સંપૂર્ણ VUKAR catalogue જુઓ: starter panels, auto switches, water level...
-
Three Phase Borewell DOL Panels with Timer (TPM) કલેક્શન
અહીં Three Phase Borewell DOL Panels with Timer (TPM)ના options compare કરો....
Blog posts
View all-
DOL Starter Coil Voltage: યોગ્ય Replacement Coi...
Mohit Vekariaત્રણ સાચા TeSys D part codesથી coil supply સમજો અને replacement enquiry તૈયાર કરો.
DOL Starter Coil Voltage: યોગ્ય Replacement Coi...
Mohit Vekariaત્રણ સાચા TeSys D part codesથી coil supply સમજો અને replacement enquiry તૈયાર કરો.
-
Forward/Reverse DOL Starter: Interlocks કેવી રી...
Mohit VekariaConveyorના ઉદાહરણથી command, feedback અને machineની actual movement અલગ ઓળખો.
Forward/Reverse DOL Starter: Interlocks કેવી રી...
Mohit VekariaConveyorના ઉદાહરણથી command, feedback અને machineની actual movement અલગ ઓળખો.
-
DOL Starter Overload Relay Range Chart: યોગ્ય R...
Mohit Vekaria9.2 Aનું ઉદાહરણ, relay ranges અને supplierને આપવાની વિગતો.
DOL Starter Overload Relay Range Chart: યોગ્ય R...
Mohit Vekaria9.2 Aનું ઉદાહરણ, relay ranges અને supplierને આપવાની વિગતો.
-
Timer સાથેનો DOL Starter: Timed Stop, Run/Rest ...
Mohit Vekariaત્રણ અલગ pump scenariosમાં start અને stopની શરત નક્કી કરીને યોગ્ય timer પસંદ કરો.
Timer સાથેનો DOL Starter: Timed Stop, Run/Rest ...
Mohit Vekariaત્રણ અલગ pump scenariosમાં start અને stopની શરત નક્કી કરીને યોગ્ય timer પસંદ કરો.
Blog posts
View all-
WhatsApp દ્વારા VUKAR વોરંટી રજિસ્ટ્રેશન
ડિજિટલ મીટરમાં WRT સુધી જાઓ. 3 અંકનો કોડ અથવા ફોટો WhatsApp પર મોકલો. પાસવર્ડ નાખીને ડિવાઇસ ફરી ચાલુ કરો.
WhatsApp દ્વારા VUKAR વોરંટી રજિસ્ટ્રેશન
ડિજિટલ મીટરમાં WRT સુધી જાઓ. 3 અંકનો કોડ અથવા ફોટો WhatsApp પર મોકલો. પાસવર્ડ નાખીને ડિવાઇસ ફરી ચાલુ કરો.
-
Relay કેવી રીતે કામ કરે છે: Interactive Pump St...
Interactive relay walkthroughમાં pump start requestનો માર્ગ જુઓ અને ચાર સામાન્ય faults control sequence ક્યાં અટકાવે તે સમજો.
Relay કેવી રીતે કામ કરે છે: Interactive Pump St...
Interactive relay walkthroughમાં pump start requestનો માર્ગ જુઓ અને ચાર સામાન્ય faults control sequence ક્યાં અટકાવે તે સમજો.
-
Megger Test: હેતુ, પ્રક્રિયા અને Insulation Res...
Motor insulation resistance સમજો, ઘટતી megohm reading શું બતાવી શકે અને test reportમાં કઈ માહિતી માગવી તે જાણો.
Megger Test: હેતુ, પ્રક્રિયા અને Insulation Res...
Motor insulation resistance સમજો, ઘટતી megohm reading શું બતાવી શકે અને test reportમાં કઈ માહિતી માગવી તે જાણો.
-
RCBO Full Form: કામ કરવાની રીત અને RCCBથી તફાવત
RCBO શું સુરક્ષિત કરે છે, તેના markings કેવી રીતે વાંચવા અને RCCB તથા અલગ MCBs સાથે તેની તુલના જુઓ.
RCBO Full Form: કામ કરવાની રીત અને RCCBથી તફાવત
RCBO શું સુરક્ષિત કરે છે, તેના markings કેવી રીતે વાંચવા અને RCCB તથા અલગ MCBs સાથે તેની તુલના જુઓ.