VUKAR BOM-G Borewell Starter Panel: Installation and Cyclic Timer Settings
Mohit VekariaShare
For a BOM-G borewell starter panel setup, match the single-phase pump and panel variant first. Set the run and rest durations for the borewell and test a full cycle. The built-in auto switch supports time-based operation. Have a licensed electrical contractor install the panel and use the wiring diagram for the installed model and revision.
BOM-G installation and motor match
Find the motor nameplate or the paperwork for the pump. Record the phase, rated voltage, horsepower (HP) and rated current in amps. Check the BOM-G panel label and share both sets of details with the installer. The product listing shows these options: 0.5 HP, 0.75 HP, 1 HP, 1.5 HP, 2 HP and 3 HP. Have the installer confirm the exact variant and its suitability for the motor and operating duty. See BOM-G specifications and variants
If you are replacing a panel, keep the pump documents and record how the old setup was used. Ask the installer to compare the new panel and motor connections with the supplied diagram. Existing labels can help identify the conductors, while the electrician verifies each connection before energizing.
Ask the installer to verify protective earthing, the supply and motor connections, and the circuit protection for the installation. Where the motor needs capacitors, the installer should confirm the type, rating and connections from the motor and panel documentation. The supply must be isolated and verified off before the enclosure is opened for wiring or service. Central Electricity Authority safety regulations

BOM-G cyclic timer settings and operating mode
Choose the run and rest intervals
The cyclic timer alternates a run period and a rest period in the appropriate operating mode. Start by checking how long the pump can deliver water steadily and how much rest the source needs before the next run. Follow the pump maker’s guidance on duty and starts. Use those observations with the installer to choose the first settings for a supervised test.
Read the saved run and rest values back with their units. Start the test with water available and enough room at the receiving end. Watch for the programmed stop, measure the rest period, and stay for the next permitted start. You can then compare the actual behavior with the intended sequence instead of diagnosing the cycle from a single stop. VUKAR pump timer types
When you review the cycle later, change one approved timing value at a time and record the result. If the motor keeps stopping before the planned interval, check the display and water delivery before increasing run time. The cause could be a supply, water-source or protection condition.

Match the run and rest labels to the panel
One BOM-G instruction set uses ONT for the motor run interval and OFT for the rest interval, both in minutes. VUKAR’s parameter matrix also lists RUN and RST for those functions. Check which labels your panel shows and use the sequence supplied for that revision. Record the labels and values together so the next person can identify the correct setting quickly.
What matters at this site
Base the rest time on how quickly the borewell recovers and the pump maker’s limits on starts. Water that returns slowly can make a previously stable cycle unreliable as the season changes.
Keep the borewell and tank conditions in view during the first run. A borewell can deliver less water as the run continues. Ask the installer to check how delivery changes and follow the pump maker’s limits for operating time and starts. Record what the delivery looks like once the pipe has filled and the flow has settled.
How to use BOM-G after installation
Ask the installer to explain the conditions required before starting the pump. Check that the receiving tank or delivery point can accept water, that the source can supply the pump, and that you can use the normal stop control from a dry area. Keep the panel closed during the watched test.
- Confirm the mode and saved settings. Read the active setting and its unit with the installer. Agree on what should make the motor start and what should make it stop in this mode.
- Watch a normal start and stop. Watch the first run stop and the next permitted start. Ask the installer to document the panel’s recovery behavior after an outage in the selected mode.
- Ask about automatic restart. Confirm what the selected mode does when power returns, a timer becomes eligible, or a protection condition clears. Have the installer explain how to leave the equipment safely isolated for service.
- Record the observed result. Write down the motor rating, panel variant, selected mode, settings, display readings and actual stop or restart behavior. Keep the date and the correct diagram in the same record.
The installer should show the operator how to read the display and stop the pump safely. If the observed behavior differs from the planned sequence, keep the pump under supervision while the installer checks which setting or signal controls the motor. Watch the BOM-G product video
What to record during the first test
- Start of run
- Write down the active mode, motor start time and whether water begins to flow normally.
- End of run
- Compare the actual elapsed time with the saved run duration. Check the panel indication and whether delivery stayed steady.
- Rest period
- Measure from the actual motor stop. Record any display indication and whether the water source has time to recover.
- Next permitted start
- Check that the elapsed rest time and observed restart match the sequence the installer set.
Use the complete cycle as the reference for future checks. If the pump stops at the right time but water delivery had already slowed, inspect the source and installation before extending that run. If the timing is correct and the source recovers reliably, keep the values and observed start frequency together for the next service visit.
If the BOM-G pump stops or fails to start
If the pump stops before the expected run time and water delivery has weakened, record the display and the change in flow. Have the source and protection settings checked before lengthening the run.
Write down the exact display code and what the pump did just before it appeared. VUKAR uses FOL for overload, FDR for dry run, HIU for high voltage and LOU for low voltage. If the same fault returns, ask the installer to diagnose the cause before operating again. VUKAR fault-code guide

An observed flow change helps narrow down what happened. Record whether water delivery was steady, fell gradually, or stopped at the same instant as the motor. That detail helps the installer decide where to check first on a borewell installation.
Can I use the same run and rest settings year-round?
Check them when the source water level, usage or pump changes. Observe whether delivery stays steady near the end of the run and whether the source is ready when the rest period ends.
What should the operator record at handover?
Keep the panel label, pump nameplate details, correct wiring reference and observed results together. Record the active mode and run and rest intervals, water supply and restart checks. Add any conditions the installer checked, such as the normal display at startup and the expected behavior after power returns. When something changes later, this gives the technician the settings and conditions from a known working run.
Recommended BOM-G Settings: Cyclic Run and Rest for Borewell Pumps