Digital Auto Switch Videos

Before choosing a digital auto switch

Use these connection examples to compare devices for your pump and starter. Confirm the supply phase, operating current, motor HP and required timer functions before ordering.

Compare digital auto switch models.

Questions before choosing

How do I choose the right single-phase current range?

DEV-K1 and DEV-K3 list 1–35 A single-phase applications, while DEV-K2 and DEV-K4 list 5–200 A. Matching the motor’s operating current to the selected range helps narrow the device choice. Review the supply, starter/control circuit and required timer functions alongside the motor nameplate.

Which auto-switch models give me clock scheduling?

DEV-K3, DEV-K4 and DEV-P2 combine clock and cyclic timing. DEV-K1, DEV-K2 and DEV-P1 provide cyclic timing for repeated ON/OFF intervals. Choose the scheduling pattern you want, then select the appropriate phase and current range.

Timer types explained

Which auto-switch options suit three-phase pumps?

DEV-P1 and DEV-P2 are the three-phase options in this comparison. P1 provides cyclic timing, while P2 adds clock scheduling for chosen times of day. Use the selected model’s starter connection guide and phase requirements when planning the installation.

What motor information helps me choose an auto switch?

Use the motor HP, operating current, supply phase and existing starter details together. These identify the appropriate device range and control-circuit requirements more clearly than HP alone. Have the installer match that information to the model and timer package before ordering.

How does an auto switch fit into the starter arrangement?

An auto switch provides documented control functions for the pump and starter arrangement. Choose it with the exact connection guide so the control device and motor-switching equipment form the intended installation. If you are selecting a complete assembled starter, compare the starter-panel range for that requirement.

When should I choose an auto switch or a level controller?

Choose the K/P auto-switch models here for their phase, current range and timed-operation functions. Choose a dedicated water-level controller when pump operation should follow tank demand. The timer guide helps distinguish a run-duration or repeating pattern from a level-based filling job.

How do the power-on delay and cyclic OFF interval help the plan?

The power-on start delay provides a wait after supply returns, while the cyclic OFF interval supplies the rest period within a repeating pattern. They address different parts of operation and can be set for the site’s motor and source conditions. Choose the intervals using the exact model’s guide and actual source availability.

Which diagram should my electrician use?

Use the diagram supplied for the exact auto switch and starter arrangement. The single-phase borewell example here is labelled DEV-K2/DEV-K4 and helps identify that particular connection family. For another device or starter, begin with its matching model guide so the connections can be checked directly.

How can the fault display help me get useful guidance?

The display gives a fault indication that can be recorded with the model and pump conditions. That information provides a clear starting point for the checks described in the fault guide. Have the cause and settings assessed before a controlled restart when the fault recurs.

Fault-code guide

What should be agreed for an unattended timed-pumping setup?

Agree the clock schedule or run/rest pattern, power-on delay and selected model’s restart behaviour. This gives the installer a clear operating plan for the motor, source and existing starter. Keep the agreed settings with the installation and isolate it before maintenance because automatic operation may include a restart.