MOM-T product videos
MOM-T Single Phase Monoblock (Tullu) Pump Starter with Clock Timer is designed for 0.5–3 HP single phase monoblock (Tullu) pump variants. It combines pump operation controls with dry-run, overload and voltage protection.
MOM-T hardware overview
English captions · 14 seconds · No spoken audio
Read the video text
MOM-T: front panel. Clock and cyclic timer functions.
MOM-T: internal panel layout. Use the supplied model guide for the selected panel and motor.
Match the motor rating and supply. Use the model wiring guide and a qualified electrician.
Before choosing MOM-T
Choose this model for motor protection and timed operation where automatic tank-level control is not required. MOM-T adds Clock Timer scheduling to the Cyclic Timer and motor-safety package.
Questions before choosing
Which pump installation is MOM-T a good fit for?
MOM-T is designed for a compatible single phase monoblock (Tullu) installation and combines clock and cyclic timing with motor protection. This makes its function package easy to match to the way you want the pump to operate. Start with the pump type and supply, then select the motor-rating option from the product details.
How do I select the right MOM-T motor-rating option?
The listed MOM-T range is 0.5–3 HP, with the individual option selected for the motor nameplate. Matching HP, operating current and the single phase supply gives the installer the right basis for wiring and protection setup. Use your motor details alongside the product options when choosing the variant.
How do MOM-T’s Clock Timer and Cyclic Timer help with scheduling?
MOM-T includes both Clock Timer and Cyclic Timer functions. Clock timing supports chosen times of day, while cyclic timing supports repeated ON/OFF intervals. Decide which pattern fits your pumping plan and have the selected mode configured for that requirement.
When is MOM-T the right choice for timed pumping?
MOM-T is suited to time-based pump operation where tank level is managed separately. Its timer provides the selected operating pattern, while the receiving tank remains a separate part of the pumping plan. If you want the pump to respond automatically to tank demand, compare the corresponding water-level-control options.
How can I choose a useful running duration for MOM-T?
MOM-T controls pump operation by time, so choose a duration for the actual pumping conditions and water requirement. For measured litres, use a suitable water-measurement method alongside the timer; for filling to a level, choose the appropriate level-control function. Use the timer guide to decide which of those jobs your installation needs.
How should MOM-T be prepared for a scheduled run after a power cut?
MOM-T includes Clock Timer and Cyclic Timer functions for the pumping schedule. Plan the required operating times, running duration and power-on start delay, then confirm how the selected mode handles an interrupted run. Having those settings agreed during commissioning gives you a clear operating plan for unattended schedules.
How does MOM-T’s power-on delay fit into the timer setup?
MOM-T’s power-on start delay provides a configured wait before starting after supply returns. The run or cyclic settings then determine the subsequent timed operation. Set the start delay and operating pattern separately for the connected pump, with electrical protection configured for the supply conditions.
How can I use MOM-T’s saved running hours for maintenance?
MOM-T’s total running hours remain saved across days and power cuts. Recording the reading at service visits lets you calculate operating hours between valid readings for the same motor and counter. Keep the model, date and work done in the service record, and use the pump manufacturer’s maintenance guidance when planning the next visit.
How do I choose between MOM-T and MOA-T?
MOM-T offers clock and cyclic timing, while MOA-T offers automatic tank-level control with clock and cyclic timing. Compare those functions with the timed-operation, tank-filling or MCB requirement at your site. Open the related model details and match the pump application, supply and motor variant before making the choice.
What makes a good MOM-T installation and handover?
Have a qualified electrician match the single phase supply, motor rating and model wiring to the selected MOM-T variant. Set and test the timed operating pattern for the actual pump and water source. Keep the supplied diagram and agreed settings with the panel so future operation and service start from the correct model information.